1 These Regulations may be cited as the Canada Oil and Gas Drilling and Production Regulations.
Canada Oil and Gas Drilling and Production Regulations
C.R.C., c. 1517In forceCurrent to September 30, 2026 (Justice Canada: October 19)HistoryMade under: Territorial Lands Act
ss. 1 to 52
Short Title
Interpretation
- barrel
barrel means 35 gallons; (baril)
- blowout
blowout means the unintentional and uncontrolled escape of oil or gas, as from a drilling well when high formation pressure is encountered; (éruption)
- blowout preventer
blowout preventer means a casing-head control fitted with special gates or rams that can be closed around the drill pipe and completely close the top of the casing if the pipe is withdrawn; (dispositif anti-éruption)
- field
field means
- gas-oil ratio
gas-oil ratio means the number of cubic feet of gas produced per barrel of oil; (rapport gaz-pétrole)
- gas well
gas well means a well
(a) that produces natural gas not associated or blended with oil at the time of production,
(b) that produces more than 30,000 cubic feet of natural gas to each barrel of oil from the same producing horizon,
(c) wherein the gas producing stratum has been successfully segregated from the oil and the gas is produced separately, or
(d) that is classified as a gas well by the Minister for any reason; (puits de gaz)
- oil well
oil well means any well capable of producing oil and not being a gas well; (puits de pétrole)
- pipeline
pipeline means any pipe or any system or arrangement of pipes wholly within Canada lands whereby oil or gas is conveyed from any wellhead or other place at which it is produced, to any other place, or from any place where it is stored, processed or treated, to any other place, and includes all property of any kind used for the purpose of, or in connection with, or incidental to, the operation of a pipeline in the gathering, transporting, handling and delivery of oil or gas, and without restricting the generality of the foregoing, includes tanks, surface reservoirs, pumps, racks, storage and loading facilities, compressors, compressor stations, pressure measuring and controlling equipment and fixtures, flow controlling and measuring equipment and fixtures, metering equipment and fixtures, and heating, cooling and dehydrating equipment and fixtures, but does not include any pipe or any system or arrangement of pipes which constitutes a distribution system for the distribution of gas to ultimate consumers; (pipe-line)
- pool
pool means a natural underground reservoir containing or appearing to contain an accumulation of oil or gas or both separated or appearing to be separated from any other such accumulations; (nappe)
- waste
waste includes
(a) the inefficient, excessive or improper use or dissipation of reservoir energy,
(b) the locating, spacing, drilling, equipping, operating or producing of any well or wells in a manner that results or could result in reducing the quantity of oil or gas ultimately recoverable from any pool,
(c) the inefficient storing of oil or gas, whether on the surface or underground,
(d) the producing of oil or gas in excess of transportation or marketing facilities or of reasonable market demand, and
(e) the locating, drilling, equipping, operating or producing of a well or wells in a manner that causes or could cause unnecessary or excessive surface loss or destruction of oil or gas; (déperdition)
- zone
zone means any stratum or strata designated by the Minister as a zone, either generally or in respect of any designated area, or any specified well or wells. (zone)
(2) All other words have the same meaning as in the Canada Oil and Gas Land Regulations.
Application
3 (1) These Regulations apply to all wells and all operations carried out for the purpose of searching for, producing or transporting oil or gas on Canada lands that are under the control, management and administration of the Minister.
(2) These Regulations apply to all operations carried out under the authority of a licence, permit or lease granted or issued pursuant to the Territorial Oil and Gas Regulations Footnote 1
Return to footnote 1Revoked by SOR/60-182.
Notice of Drilling
4 (1) No person shall drill a well or undertake a program of structure test hole drilling unless he has given notice of his intention to begin such operations to the Oil Conservation Engineer and has obtained the approval of the Oil Conservation Engineer.
(2) The notice mentioned in subsection (1) shall be made in triplicate in a form approved by the Department.
5 (1) Subject to subsection (2), no person shall depart from the program of operations that has been approved by the Oil Conservation Engineer without the further approval of the Oil Conservation Engineer.
(2) Where an immediate change in the approved program of operations is necessary, such changes may be made without the approval of the Oil Conservation Engineer, but notice in writing of the change shall be sent to the Oil Conservation Engineer as soon as possible.
Rotary Drilling Procedure
6 (1) Surface casing satisfactory to the Oil Conservation Engineer shall be used in wells and shall be placed to the depth required by him.
(2) Surface casing shall be cemented by the pump and plug or displacement method from the bottom to top and cement shall be allowed to set for not less than 12 hours under pressure before drilling the plug.
(3) Production casing or intermediate strings of casing when run shall be of a design to meet safety factors of 1.60 in tension, 1.125 in collapse and 1.0 in burst.
(4) The casing design shall be submitted in triplicate to the Oil Conservation Engineer on a form approved by the Chief.
(5) Production casing shall be cemented to a height sufficient to ensure isolation of the productive zones.
(6) The pump and plug method of cementing shall be used and the cement shall be allowed to set for not less than 24 hours and shall be pressure tested in accordance with good oil field practice before the cement plug is drilled.
Blowout Preventers and Casing Heads
7 (1) In proven areas, the use of blowout preventers is obligatory and they shall be used in accordance with established good practice.
(2) In unproven areas, all drilling wells shall be equipped with minimum blowout-control equipment consisting of
(3) Controls for the blowout preventers shall be located at a point not less than two feet outside the substructure.
Cable Drilling Procedure
8 (1) Before commencing to drill, proper and adequate slush pits shall be constructed for the reception of mud of sufficient quality and quantity so that such mud may be available if and when the hole is plugged, and where cable tools are used, sufficient surface casing shall be set to a depth specified in the notice of intention to drill and cemented from bottom to top and no natural gas that may be encountered in any section of a cable tool drilled hole above the ultimate objective may be permitted to blow while drilling proceeds, but shall be shut off either by mudding or by the running of a string of casing, and, if the latter method is used, such string of casing shall be tested by bailing to insure shut-off before drilling proceeds.
(2) The casing program adopted for cable tool drilled wells shall be planned to protect any potential oil or gas bearing horizons penetrated during drilling from infiltration of injurious waters from other horizons and to prevent the migration of oil or gas from one horizon to another.
Coring and Testing
9 The licensee, permittee or lessee shall, when a well being drilled is approaching a formation from which production of oil or gas may be expected, if required to do so by the Oil Conservation Engineer, core and adequately test such formation, but such coring and testing must be reasonable and proper and not detrimental to the operations being performed and such test shall not be required unless the hole is in proper condition.
Samples and Cores
10 (1) Unless otherwise directed by the Oil Conservation Engineer, each licensee, permittee or lessee shall cause to be taken, preserved and maintained a series of samples at interval depths of 10 feet of the various formations that non-coring drilling penetrates in drilling a well or structure test hole, and the samples shall be washed, dried, preserved in bags accurately labelled with the name of the well, interval, depth, date of sample and shall be forwarded prepaid in accordance with instructions issued by the Oil Conservation Engineer.
(2) All cores taken from the core barrel shall be stored in book fashion in core boxes and accurately labelled on the body, not the lid, of each box as to the number and interval of the core, top, bottom and footage recovery of the core and the name of the well from which the core is taken.
(3) Boxes shall be of stout wooden or metal construction the sides of which shall project above the level of the contained cores and lids shall be securely fixed to ensure safe transit, and such boxes shall not exceed three feet in length.
(4) Reasonable steps shall be taken to protect boxes containing the cores from theft, misplacement or exposure to the weather and after reasonable time has been afforded the licensee, permittee or lessee to carry out examinations and obtain core analyses of them, they shall be forwarded prepaid to the Oil Conservation Engineer when directed by him to do so.
(5) Without the consent of the Oil Conservation Engineer, no cores shall be destroyed or taken out of Canada except such portions thereof as are reasonably necessary for analytical purposes.
Deviation Test
11 The licensee, permittee or lessee, when directed by the Oil Conservation Engineer, shall make or cause to be made tests at intervals not exceeding 500 feet from the top to the bottom of the well or such lesser intervals as the Oil Conservation Engineer may require for the purpose of ascertaining to what extent, if any, the well deviates from the vertical and shall submit a report of the tests with the daily drilling reports at the end of each week.
Logs
12 (1) Unless otherwise directed by the Oil Conservation Engineer, the permittee or lessee shall cause to be taken one electric log and one other type of electric log, radio-activity log, sonic log or other log approved by the Chief so that the information provided by the two logs shall be sufficient for determining the contacts between horizons or zones penetrated and the porosity and fluid saturation of all potential reservoir horizons.
(2) The title to each log shall contain all information necessary to identify that log and to allow the quantitative and qualitative analysis referred to in subsection (1) to be made.
(3) Three copies of each log shall be sent to the Oil Conservation Engineer within 30 days of the date on which the log was taken.
Daily Reports
13 (1) While drilling is in progress on wells, the licensee, permittee or lessee or their agents shall maintain on a form approved by the Chief a daily report of drilling operations and such report shall be made in duplicate, one copy being at all times retained at the well and open to inspection by the Oil Conservation Engineer.
(2) A copy of the original report shall be forwarded to the Oil Conservation Engineer at the end of each and every week during the course of such drilling operations.
(3) Such daily report shall set out complete data on all operations carried on during the day and, without restricting the generality of the foregoing, shall include
(a) depth at the beginning of the day or tour;
(b) depth at the end of the day;
(c) formation penetrated;
(d) any change in casing;
(e) if casing set, all data regarding setting with size, type, grade and weight of casing whether new or used and depth at which it is set;
(f) particulars of cementing;
(g) any water, oil or gas encountered, even if only small showings;
(h) a report on any deviation surveys, formation tests or other tests carried on; and
(i) information on any other operations carried on such as fishing, shooting, perforating, acidizing, surveying, whipstocking or abandonment.
Encounters of Oil or Gas
14 (1) Where the licensee, permittee or lessee encounters in significant quantities oil or gas in a well outside a designated pool or field, he shall notify the Oil Conservation Engineer, by the most expeditious method, of the character, extent and quantity thereof.
(2) In such instances mentioned in subsection (1) and where practicable, the licensee, permittee or lessee shall take and preserve samples for a reasonable time in an amount of not less than one quart of oil or water and in the case of gas, sufficient to fill a container satisfactory to the Oil Conservation Engineer.
(3) When requested to do so by the Oil Conservation Engineer, the licensee, permittee or lessee shall forward the samples referred to in subsection (2) to him.
Abandonment of Wells
15 (1) Before abandoning a well drilled under these Regulations and before removing any part of the casing therefrom, the licensee, permittee or lessee shall notify the Oil Conservation Engineer in writing of his intention to so do on a form approved by the Chief in triplicate and shall obtain written approval of such abandonment and removal of casing from the Oil Conservation Engineer but such approval may first be given orally.
(2) In abandoning wells, cement plugs shall be used to protect porous formations and unless otherwise directed by the Oil Conservation Engineer, the plugs shall be felt for in accordance with good oil field practice and new plugs shall be placed when necessary.
(3) The interval between plugs shall be filled with an approved mudladen fluid of proper density unless otherwise directed by the Oil Conservation Engineer.
(4) Seismic shot holes and structure test holes shall be abandoned by a method approved by the Oil Conservation Engineer and in accordance with good oil field practice.
(5) Upon abandonment of the well, all excavations shall be filled and exact locations of such well or hole shall be marked by a pipe not less than two inches in diameter set solidly into a concrete block or other approved material and projecting at least four feet above ground level.
(6) The name of the well shall be plainly and permanently marked on the pipe in a manner approved by the Oil Conservation Engineer.
Restoration of Surface
16 The licensee, permittee or lessee shall, as soon as weather or ground conditions permit, upon the final abandonment and completion of the plugging of any well or structure test hole, clear the area around the location of all refuse material, burn waste oil, drain and fill all excavations, remove concrete bases, machinery and materials other than the marker provided for in subsection 15(5) and level the surface to leave the site as nearly as possible in the condition encountered when operations were commenced.
Reports to Oil Conservation Engineer
17 (1) A report in triplicate on a form approved by the Chief shall be forwarded to the Oil Conservation Engineer within 30 days of
(2) The licensee, permittee or lessee shall, within 30 days of receiving core, oil, gas or water analyses by him or caused to be made by him, submit copies in duplicate to the Oil Conservation Engineer.
(3) Upon completion of a structure test hole program the licensee, permittee or lessee shall submit to the Oil Conservation Engineer a report on a form approved by the Chief in triplicate on each hole drilled.
18 (1) Within 30 days after the completion of a well or the recompletion of a well into a different producing interval or a workover operation, a report in triplicate shall be filed with the Oil Conservation Engineer on a form approved by the Chief by the permittee, lessee or his authorized agent.
(2) Within 30 days after the initial production test following completion, recompletion or any workover operation, a supplemental well completion report in triplicate shall be filed with the Oil Conservation Engineer on an approved form.
(3) During any period of testing as required by the Oil Conservation Engineeer following completion, recompletion or workover operation, the licensee, permittee or lessee shall report weekly, if mail service permits, in duplicate, the daily production and such report shall be specific as to the recovery of oil or gas and the period of time in which production was obtained.
Suspension of Drilling or Production
19 (1) The licensee, permittee or lessee shall notify the Oil Conservation Engineer by submitting notification on a form approved by the Chief in triplicate before drilling or production operations are suspended at any well.
(2) The licensee, permittee or lessee shall comply with all precautionary measures required by the Oil Conservation Engineer.
20 The licensee, permittee or lessee shall not resume operations on any well that has been suspended without previously notifying the Oil Conservation Engineer and submitting the form approved by the Chief in triplicate.
Where Wells or Holes to Be Drilled
21 (1) Except with the approval of the Oil Conservation Engineer, no well shall be drilled
(a) within 250 feet of the outer boundaries of a leased area, any road allowance, surveyed road, railway, pipeline, high voltage power line or other right-of-way, dwelling, industrial plant, building used for military purposes, permanent farm building, school or church; or
(b) within 1/2 mile of any existing or proposed flightway or any airfield.
(2) A licensee, permittee or lessee shall carry on his operations with a minimum of inconvenience and interference with existing or proposed airfields.
Well Spacing
(2) The Chief may designate a grid area as a well spacing area and no person shall drill a well within a well spacing area except within a target area approved by the Chief.
Oil and Gas to Be Conserved
23 Whenever a stratum penetrated in a well or structure test hole is capable of producing gas, the licensee, permittee or lessee shall take all reasonable precautions and confine such gas to its original stratum until such time when such gas can be produced and utilized without waste.
24 (1) The licensee, permittee or lessee shall make provision to the satisfaction of the Oil Conservation Engineer for the control and conservation of oil and gas at every well and structure test hole and he shall take all reasonable steps to maintain his equipment for such purpose in proper condition.
(2) Where at any time, in the opinion of the Oil Conservation Engineer, such equipment is inadequate, he may prescribe the remedial measures that shall be instituted and completed before any further drilling or production is undertaken.
Precaution Against Waste
25 Every licensee, permittee or lessee shall take all precautions to the satisfaction of the Minister to prevent waste.
Testing of Wells
26 The surface and subsurface equipment of every oil and gas well shall be so arranged as to allow the taking of closed-in pressure, bottom hole pressure, the working pressure and the making of any reasonable tests required.
Equipment Required
27 (1) No equipment, casing or tubing used in drilling or production shall be used unless it is in good general condition and complies in all respects with these Regulations.
(2) Each well shall be cased in such manner as may be prescribed or approved by the Oil Conservation Engineer, unless he is satisfied that casing is not required in any particular case.
Defective or Inadequate Equipment
28 (1) Where it appears to the Oil Conservation Engineer that any equipment, casing or tubing used in drilling or production is inadequate, defective or hazardous, he may require the replacement or reconditioning of the equipment, casing or tubing, and may require that operations be discontinued until the required action is taken.
(2) The subsurface equipment shall include a pincollar or its equivalent at the lower end of the production tubing as a safeguard against loss of testing equipment, but the Oil Conservation Engineer may grant permission to dispense with the pincollar.
(3) The surface equipment shall include such valve connections as are necessary to sample the oil, gas or water produced.
Plan to Be Furnished
29 The lessee shall furnish to the Oil Conservation Engineer upon request a plan in duplicate showing the position of all wells, pipelines, tanks, buildings or other structures on the leased area.
Minister May Take Remedial Measures
30 (1) The licensee, permittee or lessee shall at all times take reasonable measures to the satisfaction of the Oil Conservation Engineer to prevent or to remedy the injurious access of water, gas or oil into a formation.
(2) Where any well is a menace to oil, or water-bearing formations or to life or property, and if remedial measures are considered necessary and the licensee, permittee or lessee of the well fails to use such measures as may be directed by the Minister, the Minister shall, at the expense of the licensee, permittee or lessee, take such steps and employ such persons as he considers necessary to carry out the remedial measures and for that purpose may
(a) enter upon, seize and take possession of any such well, together with the whole or part of the movable and immovable property in, on or about the well or used in connection therewith or appertaining thereto; and
(b) take over the management and control thereof for the time necessary to carry out the remedial measures.
Excavations and Disposal of Earth, Rock and Waste
31 (1) The permittee or lessee shall enclose and keep enclosed all openings or excavations made in connection with or for the purpose of exploring for and producing oil and gas or other operations.
(2) The licensee, permittee or lessee shall at all times make such provisions to the satisfaction of the Oil Conservation Engineer for the disposal of the earth, rock, waste or refuse that it shall not be an inconvenience, nuisance or obstruction to any roadway, pass, passage, river, creek or place or to any private or Canada lands, or conflict or embarrass the operating of any mines on the said lands, or in any manner whatsoever occasion unnecessary private or public damage, nuisance or inconvenience.
Salt Water
32 The licensee, permittee or lessee shall take all reasonable care and carry out such measures as may be satisfactory to the Oil Conservation Engineer with regard to the disposal of salt water.
Storage
33 When an area is designated as a field by the Minister, or where it is expected that oil and gas will be encountered, adequate provision shall be made
Safety Precautions to Be Taken
34 (1) No oil shall be stored in an unprotected excavation or in storage receptacles that are inadequate or likely to cause reasonably avoidable waste or loss.
(2) All tanks or batteries of tanks shall be surrounded by a dike or ditch of a capacity greater than that of the tank or battery of tanks and the dike or ditch shall be maintained in good condition and free from high grass, weeds or combustible material.
(3) All oil tanks or batteries of tanks shall be located at least 200 feet from the outer perimeter of the ditch or dike to any road allowance, surveyed road, railway other than siding, high voltage power line or other right-of-way, dwelling, industrial plant, existing or proposed aircraft runway or taxiway, building used for military purposes, farm building, school, church or cemetery and shall not be located in the flightway of an airfield within 1,000 feet of the end of the runway without a special permit.
(4) Reasonable precautions shall be taken to prevent salt water, drilling fluid, waste, oil or refuse from tanks or wells from flowing over the land.
(5) Any rubbish or debris that might constitute a fire hazard shall be removed to a distance of at least 150 feet from the vicinity of any well, tank or pump station.
(6) All waste, oil and refuse from tanks or wells shall be drained into proper receptacles located not less than 100 feet from any tank, well or building and shall be burned immediately or transported from the premises, and when necessary and practicable, surrounded by a fireguard.
(7) No flammable product or waste produce of any kind from any oil or gas well shall be permitted to run into any lake, stream or other body of water or on to any highway or public road.
(8) No flare pit or end of flare line shall be located closer than 250 feet to any road allowance, surveyed road, railway, pipeline, high voltage power line or other right-of-way, dwelling, industrial plant, aircraft runway or taxiway, building used for military purposes, permanent farm building, school, church or cemetery, except where the Oil Conservation Engineer finds a lesser distance is justified under the circumstances.
Gas Metering
35 (1) A well producing gas shall be equipped with a gas meter of a type approved by the Oil Conservation Engineer, and no gas shall be produced at a well unless it is metered or the Oil Conservation Engineer gives permission to dispense with a meter.
(2) Each orifice meter shall be installed in accordance with the regulations made under the Gas Inspection Act.
(3) Where gas from several wells is brought to a common point for metering, each meter shall be marked clearly to indicate the source of gas being measured.
(4) Any by-pass around a meter shall be closed by valves or stop-cocks that effectively stop all flow of gas when closed, and, on every occasion when the by-pass is operated and on any extraordinary occasion where gas does not reach the meter, a suitable entry shall be made on the meter chart.
(5) Whenever an orifice plate is installed or changed, a record of the time and the size of the orifice removed and inserted shall be recorded on the meter chart.
(6) Each orifice meter-run installed shall be equipped with a thermometer well and pressure gauge connection.
(7) The measured inside diameter of the pipe at the orifice shall be clearly marked on the pipe near the orifice flanges.
(8) The orifice plate shall show clearly the size of orifice, in inches and decimals, by figures stamped or cut into the metal of the plate, and a plate shall not be rebored or the orifice size increased without first removing or permanently defacing the old marking.
(9) Each meter shall be maintained in good and usable condition.
(10) Purchasers shall keep meter charts and records of gas purchased in a permanent file for a period of at least two years and such information shall be made available to the Oil Conservation Engineer at his request.
Orifice Meter Charts
36 (1) Orifice meter charts shall be clearly marked in such manner as to indicate the well or wells being metered and the time and the date of start and finish of records.
(2) Charts shall be computed and shall be preserved for a period of one year.
(3) In computing the quantity of gas passing the meter during the period covered by a chart, all metered gas shall be recorded together with a fair estimate of all gas passed during all periods in which the meter for any reason fails to record.
(4) Coefficients for calculating meter charts shall be computed in accordance with the regulations made under the Gas Inspection Act.
When Meters Not Required
37 (1) The Oil Conservation Engineer may permit group meter measurements.
(2) The Oil Conservation Engineer, after examination, may exempt any well or wells from metering the volume of gas produced therefrom if satisfactory estimates of the volume of gas produced are supplied to the Oil Conservation Engineer in lieu of meter measurements.
(3) Where, in the opinion of the Oil Conservation Engineer, adequate measurements are not being made of the gas produced from any well, the Oil Conservation Engineer may require that such well be closed in until such time as adequate measurements or other satisfactory arrangements for determining quantities have been made.
Testing Gas Wells
38 (1) Before production is taken initially from any gas well it shall be tested by the back-pressure method.
(2) Each producing gas well shall be tested at least every 12 months.
(3) At the request of the lessee or lessees of a majority of the gas wells in any pool not subject to special pool regulation, the Oil Conservation Engineer may direct that such gas wells in the pool be tested by any standard method recognized as being practicable, except that all gas wells in any one pool shall be tested by the same method.
(4) Tests shall be made in accordance with detailed instructions obtainable from the Oil Conservation Engineer and shall be forwarded promptly to the Oil Conservation Engineer on a form approved by the Chief.
(5) Shut-in pressures shall be taken on all producing gas wells semi-annually unless the taking of such pressures is covered by special pool order.
(6) Surface shut-in pressure shall be taken with a dead-weight gauge after a minimum shut-in period of 24 hours.
(7) All shut-in pressures and the duration of the shut-in period thereof shall be reported to the Oil Conservation Engineer on the regular monthly gas well report.
(8) Open-flow and back-pressure tests on gas wells may be witnessed or observed by the Oil Conservation Engineer and he shall be given reasonable notice by the permittee or lessee of the well on which the tests are to be taken, setting the time that such tests will commence.
Well Treatment
39 (1) The licensee, permittee or lessee shall not allow a well to be shot with nitroglycerine or similar type of explosive until the Oil Conservation Engineer has been notified of the contemplated action.
(2) All reasonable precautions shall be taken when shooting, perforating, hydraulically fracturing or chemically treating a well, to ensure that no irreparable injury is done to the well, and to prevent ingress of water or other foreign substance into productive zone.
(3) The licensee, permittee or lessee shall submit to the Oil Conservation Engineer a report on all wells shot, perforated, hydraulically fractured or chemically treated on a form approved by the Chief and shall include particulars of the results obtained.
(4) In case any injury is done to the well by shooting, perforating, hydraulically fracturing or chemically treating, the licensee, permittee or lessee may repair or abandon the well and it shall be repaired or abandoned promptly to the satisfaction of the Oil Conservation Engineer if such repair or abandonment is reasonably necessary to prevent waste of oil or gas or damage to persons or property.
Gas-Oil Ratio
40 (1) The maximum gas-oil ratio for a well or a pool shall be determined by the Minister.
(2) No oil well shall be permitted to produce gas in excess of the maximum ratio unless all gas produced in excess thereof, except gas used in gas-lift operations, is returned to the pool from which it was produced under conditions authorized by the Minister.
Gas-Oil Ratio Surveys
41 Gas-oil ratio surveys shall be taken in the manner approved or prescribed by the Oil Conservation Engineer.
Commingling of Production
43 The production from one pool shall not be commingled with that from another pool in the same field before measurement without permission from the Oil Conservation Engineer.
44 No permittee or lessee shall permit a well to produce either oil or gas from different pools through the same production string without first receiving written permission from the Oil Conservation Engineer.
Affixing of Seals
45 (1) The Oil Conservation Engineer, wherever he considers it necessary to do so, may seal or cause to be sealed with a metallic seal or seals any or all valves or meters installed at a well or wells or on pipelines, tanks or other receptacles used for the storage or transportation of oil or other fluid produced or withdrawn from the well or wells.
(2) The person in charge of operations at the well, and the permittee or lessee shall be notified in writing by the Oil Conservation Engineer of the affixing of the seal or seals and the reasons therefor.
(3) Any seals so affixed shall not be removed, except in case of an emergency, without authority in writing from the Oil Conservation Engineer.
Designating Pool or Field
46 The Minister may designate an area as a pool, field or both and shall name all oil and gas pools and fields in Canada lands.
Well-name Register
47 (1) The licensee, permittee or lessee shall mark each of his wells in a conspicuous place with a sign on which is printed, in reasonably large and legible letters, the name of the licensee, permittee or lessee, the name of the well and the legal description of the location and he shall keep the sign posted and the lettering clear.
(2) There shall be maintained in the Department a record of official names, to be known as the well-name register, in which shall be entered
(a) the location of each well and the name thereof, which shall be approved by the Oil Conservation Engineer;
(b) the name of the licensee, permittee or lessee and his agent or operator of the well;
(c) the name of the drilling contractor; and
(d) any subsequent name or names assigned and approved by the Oil Conservation Engineer.
(3) The last name of the well shown in the well-name register shall be the official name and the one by which the well shall be known.
(4) The Oil Conservation Engineer may grant or refuse an application to change the official name, and if the application is granted, the new name shall be entered in the well-name register.
Proration
48 The Minister may in his discretion fix and regulate the production and allowables from all wells or pools in order to effect economic production and the conservation of oil and gas.
Injection
49 (1) Where an application is made to inject fluids into an underground reservoir, the Minister may authorize or refuse to authorize such action.
(2) The application shall set forth
(a) the location of each intake well;
(b) the location of all oil and gas wells, including abandoned and drilling wells and dry holes and the names of permittees or lessees within two miles of each intake well;
(c) the formations from which wells are producing or have produced;
(d) the name, description and depth of each formation in which fluid is to be injected;
(e) the well completion program and the depth of the casing shoe or liner below which it is to be injected;
(f) the elevations of the top of the formation into which the fluid is to be injected in the intake well and the wells producing from the same formation within a two-mile radius of each intake well;
(g) a log of each intake well or such information as is available;
(h) a description of the fluid, stating the kind, where obtained and the estimated amounts to be injected daily;
(i) the name and address of the applicant or person to be in charge of the injection operation; and
(j) such other information as the Oil Conservation Engineer may require to ascertain whether the injection may be safely and legally made.
(3) Application may be made to include the use of more than one intake well.
(4) Each application shall be executed by the lessees who are willing to participate in the proposed operations.
(5) Upon approval of the Minister, the applicant or the person in charge of injection operations shall notify the Oil Conservation Engineer
(6) Each well used for the injection of gas or water into a producing formation shall be cased with sound casing so as not to permit leakage, and the casing shall be cemented so that damage will not be caused to oil, gas or fresh water reservoirs.
(7) The lessee of an intake well shall keep an accurate record of
51 The Minister may direct that injection wells may be used by others than the applicant.
Records — Scrubbing Plant, Absorption Plant
52 (1) Each person who is the owner or who has the control or management of a scrubbing plant or absorption plant in the Northwest Territories and Yukon Territory shall keep, at his office or other place of business, records of
(a) all gas received into a scrubbing plant or absorption plant;
(b) the name and address of each person from whom the gas was received;
(c) the quantity and quality of the gas received from each person;
(d) the price payable in respect thereof; and
(e) each disposition and price received by him of any product obtained from treating or processing gas.
(2) Each person operating a plant for processing gas shall keep a daily record of such gas and file in duplicate with the Chief, not later than the 25th day of each month, a full report, on a form approved by the Chief, of the gas processed during the preceding month.