Marginal note:Verification
9 (1) Subject to subsections (2) and (3), where a contractor or purchaser intends to use or cause to be used a meter for the purpose of obtaining the basis of a charge for electricity or gas supplied by or to him, the meter shall not, until it has been verified and sealed in accordance with this Act and the regulations, be put into service.
Marginal note:Temporary dispensation
(2) The director may grant permission for the putting into service, without verification and sealing or without sealing, of any meter or any class, type or design of meter on a temporary basis under such terms and conditions and for such period as the director stipulates.
Marginal note:Permanent dispensation
(3) The director may grant approval for the putting into service, without verification and sealing or without sealing, of any meter or any class, type or design of meter.
Marginal note:Director’s approval required for verification
(4) No meter shall be verified pursuant to this Act until it or the class, type or design of meter to which it belongs has received the approval of the director.
- 1980-81-82-83, c. 87, s. 9
Version in force since December 31, 2002