Navigation Safety Regulations, 2020

SOR/2020-216

In forceCurrent to September 30, 2026 HistoryRegistered on October 6, 2020Made under: Canada–Newfoundland and Labrador Atlantic Accord Implementation and Offshore Renewable Energy Management Act, Canada–Nova Scotia Offshore Petroleum Resources Accord Implementation and Offshore Renewable Energy Management Act, Canada Oil and Gas Operations Act, Canada Shipping Act, 2001

Follow

Interpretation

Section 2

Marginal note:Composite unit

  •  (1) For the purposes of these Regulations, a composite unit of a pushing vessel and a pushed vessel that are rigidly connected and designed as a dedicated and integrated tug-and-barge combination is considered to be a single vessel that is not a towboat, the length and gross tonnage of which is the aggregate length and gross tonnage of the two vessels composing the unit.

  • Marginal note:Documents — amended from time to time

    (2) Any reference in the Regulations to a document is a reference to the document as amended from time to time, except when the reference is to the document as it read on a specified date.

  • Marginal note:Incorporated documents — meaning of “should”

    (3) For the purpose of interpreting a document incorporated by reference into these Regulations, “should” is to be read as “must” and recommendations are to be considered mandatory.

  • Marginal note:Incorporated documents — meaning of “ship”

    (4) For the purpose of interpreting a document incorporated by reference into these Regulations, “ship” is to be read as “vessel”.

  • Marginal note:Incorporated documents — exclusion of certain expressions

    (5) A document incorporated by reference into these Regulations is to be read without reference to the expressions “at the discretion of the Administration”, “in the opinion of the Administration”, “or other means”, “satisfactory to the Administration” and “unless the Administration decides otherwise”, including any necessary adaptations to these expressions found in the document.

  • Marginal note:Interpretation — vessel date of construction

    (6) For the purposes of these Regulations, the date of construction of a vessel is the earliest of the dates on which

    • (a) its keel is laid,

    • (b) construction of the vessel begins, and

    • (c) the assembly of the vessel has reached the lesser of 50 tonnes and 1% of the estimated mass of all structural material of the vessel.