Hull Inspection Regulations C.R.C., c. 1432
Section 7
- Version
- In force until June 27, 2021
This provision is no longer in the consolidation.
The history holds one version of this provision.
Text deletedText added
The two versions say the same words: the change is a coming into force or a change of form.
(a) double bottoms that are not to be used for the carriage of oil: a head of water which shall be equal to the maximum head that can be experienced in service;
(b) deep tanks and peak tanks used for the carriage of water, and deep tanks and double bottom tanks arranged for the carriage of oil fuel: a head of water equal to the maximum head to which the tanks can be subjected in service but not less than 2.44 m above the crown of the tanks where the moulded depth to the strength deck exceeds 4.88 m, and 0.91 m where the moulded depth does not exceed 3.05 m; intermediate heads may be obtained by interpolation between 4.88 m and 3.05 m;
(c) peak bulkheads, which do not form the boundaries of tanks, shall be tested by filling the peaks with water to the level of the load waterline;
(d) watertight bulkheads, including recesses and watertight flats, watertight tunnels, weather decks and waterways, shall be hose tested; the pressure of water in the hose shall be not less than 207 kPa;
(e) cargo tanks in tankers shall be filled with water to a head of 2.44 m above the highest point of the tanks, excluding the hatchways;
(f) cofferdams in tankers shall be filled with water to the top of the hatchways.
(2) Where tanks are to be cemented, the tests shall be carried out before the cementing is commenced.