Skip to content

Canada Oil and Gas Land Regulations

C.R.C., c. 1518

In forceCurrent to September 30, 2026 HistoryMade under: Territorial Lands Act, Federal Real Property and Federal Immovables Act

Preliminary provisions

ss. 1 to 23

Short Title

 These Regulations may be cited as the Canada Oil and Gas Land Regulations.

Interpretation

  •  (1) In these Regulations,

    allowable expenditure

    allowable expenditure means the expenditure referred to in section 43; (dépenses admissibles)

    arbitrator

    arbitrator means the arbitrator referred to in section 97; (arbitre)

    bond

    bond means bond or other securities of or guaranteed by the Government of Canada; (titre or garantie)

    Canada lands

    Canada lands means

    • (a) territorial lands as defined in the Territorial Lands Act, and

    • (b) public lands as defined in the Public Lands Grants Act for the sale, lease or other disposition of which there is no provision in the law,

    and includes land under water; (terres du Canada)

    Chief

    Chief means the administrator of the Canada Oil and Gas Lands Administration of the Department of Energy, Mines and Resources and of the Department of Indian Affairs and Northern Development; (chef)

    commercial quantity

    commercial quantity means the output of oil or gas from a well that, in the opinion of the Chief, would warrant the drilling of another well in the same area, and in determining that opinion the Chief may consider the costs of drilling and producing and the volume of production; (quantité commerciale)

    Crown reserve lands

    Crown reserve lands means Canada lands in respect of which no interest granted or issued by or pursuant to these Regulations is in force and includes the submerged lands described in Schedule IV; (terres de réserve de la Couronne)

    Department

    Department means,

    • (a) in respect of Canada lands located in that part of Canada described in Schedule VI, the Department of Indian Affairs and Northern Development, and

    • (b) in respect of Canada lands other than those lands located in that part of Canada described in Schedule VI, the Department of Energy, Mines and Resources; (ministère)

    development structure

    development structure means any structure, facility or undertaking erected for the purpose of drilling an exploratory well or a development well or erected for the production, gathering, storing, processing, transmission or other handling of oil and gas; (plate-forme d’exploitation)

    development well

    development well means a well

    • (a) drilled pursuant to an order made under section 93, or

    • (b) the location of which is, in the opinion of the Chief, so related to the location of producible wells that there is every probability that it will produce from the same pool as the producible wells; (puits d’extension)

    exploration agreement

    exploration agreement means an exploration agreement entered into by the Minister or a person designated by the Minister pursuant to section 30; (contrat d’exploration)

    exploratory well

    exploratory well means any well that is not a development well; (puits de sondage)

    exploratory work

    exploratory work includes test drilling, aerial mapping, surveying, bulldozing, geological, geophysical and geochemical examinations and other investigations relating to the subsurface geology and all work, including the construction and maintenance of those facilities necessarily connected therewith and the building and maintenance of airstrips and roads required for the supply of or access to exploratory operations; (travaux de sondage)

    extraction plant

    extraction plant means any plant or equipment, other than a well, used for the extraction of oil or other substances produced in association with oil from surface or subsurface deposits of oil sand, bitumen, bituminous sand, oil shale or other deposits from which oil may be extracted; (usine d’extraction)

    gas

    gas means natural gas and includes all other minerals or constituents produced in association therewith, other than oil, whether in solid, liquid or gaseous form; (gaz)

    holder

    holder means, in relation to any interest granted or issued under these Regulations, the person or persons registered as holder or holders of the interest; (titulaire)

    interest

    interest includes an exploration agreement; (intérêt)

    legal survey

    legal survey means a survey referred to in section 10; (arpentage officiel)

    lessee

    lessee means a person holding an oil and gas lease; (concessionnaire or titulaire de concession ordétenteur de concession)

    licence

    licence means an exploratory licence issued pursuant to section 24; (licence)

    licensee

    licensee means a person holding a licence; (titulaire de licence or détenteur de licence)

    Minister

    Minister means,

    • (a) in respect of Canada lands located in that part of Canada described in Schedule VI, the Minister of Indian Affairs and Northern Development, and

    • (b) in respect of Canada lands other than those lands located in that part of Canada described in Schedule VI, the Minister of Energy, Mines and Resources; (ministre)

    monument

    monument means a post, stake, peg, mound, pit, trench or other device used to mark a boundary or the location of a well as set out in a plan of survey approved pursuant to section 11; (borne)

    offshore

    offshore means with respect to a drill site, a location within a water-covered area of Canada lands; (au large des côtes)

    oil

    oil means

    • (a) crude petroleum and other hydrocarbons regardless of gravity that are produced at a well head in liquid form by ordinary production methods,

    • (b) any hydrocarbons except coal and gas, that may be extracted or recovered from surface or subsurface deposits of oil sand, bitumen, bituminous sand, oil shale or other deposits, and

    • (c) any other hydrocarbons except coal and gas; (pétrole)

    oil and gas lease

    oil and gas lease means an oil and gas lease granted pursuant to section 54 or 57; (concession de pétrole et de gaz)

    Oil Conservation Engineer

    Oil Conservation Engineer means an officer of the Department or other person designated by the Minister; (ingénieur en conservation du pétrole)

    permit

    permit means an exploratory permit issued pursuant to section 30 or 32 or renewed pursuant to section 40, as those sections read before August 3, 1977; (permis)

    permittee

    permittee means a person holding a permit; (titulaire de permis or détenteur de permis)

    Petro-Canada Limited

    Petro-Canada Limited means the corporation established by section 4 of the Petro-Canada Limited Act; (Petro-Canada Limitée)

    significant discovery

    significant discovery means a discovery of oil or gas that justifies the drilling of any well or wells in addition to the well or wells in which the discovery was made; (découverte importante)

    special renewal permit

    special renewal permit means a special renewal permit granted pursuant to section 116 or 117; (permis avec clause spéciale de renouvellement)

    Surveyor General

    Surveyor General means the person designated as Surveyor General under the Canada Lands Surveys Act; (arpenteur général)

    target area

    target area[Repealed, SOR/80-590, s. 1]

    well

    well means any opening in the ground that is not a seismic shot hole and that is made, or is in the process of being made, by drilling, boring or any other method,

    • (a) through which oil or gas could be obtained,

    • (b) for the purpose of searching for or obtaining oil or gas,

    • (c) for the purpose of obtaining water to inject into an underground formation,

    • (d) for the purpose of injecting gas, air, water or other substance into an underground formation, or

    • (e) for any purpose through sedimentary rocks to a depth of at least 500 feet. (puits)

  • (2) For the purpose of these Regulations, a well is deemed

    • (a) to be abandoned on the day that all cement plugs, as required by the Canada Oil and Gas Drilling and Production Regulations, are set to the satisfaction of the Oil Conservation Engineer;

    • (b) to be completed on the day that the well is first placed on steady or intermittent production of oil or gas or both, and appears, in the opinion of the Oil Conservation Engineer, capable of maintaining steady or intermittent production; and

    • (c) to be suspended on the day that drilling or production operations are suspended in a manner approved by the Oil Conservation Engineer but the well is not abandoned or completed.

  • (3) Commercial exploitation shall be deemed to begin, with respect to a well or extraction plant, on the day on which the Minister, having considered the economic conditions, decides that a market exists commensurate to the productive capacity of the well or extraction plant.

  • SOR/80-590, s. 1
  • SOR/82-663, s. 1
  • 1991, c. 10, s. 19
  • 1998, c. 14, s. 101(F)
.

Application

 These Regulations apply only to Canada lands that are under the control, management and administration of the Minister.

Land Division

 For the purposes of these Regulations, Canada lands shall be divided into grid areas.

  •  (1) A grid area, the whole or greater part of which lies south of latitude 70°, shall be bounded on the east and west sides by successive meridians of longitude of the series 50°00′00″, 50°15′00″, 50°30′00″, which series may be extended as required, and on the north and south sides by straight lines joining the points of intersection of the east and west boundaries with successive parallels of latitude of the series 40°00′00″, 40°10′00″, 40°20′00″, which series may be extended as required.

  • (2) A grid area, the whole of which lies north of latitude 70°, shall be bounded on the east and west sides by successive meridians of longitude of the series 50°00′00″, 50°30′00″, 51°00′00″, which series may be extended as required and on the north and south sides by straight lines joining the points of intersection of the east and west boundaries with successive parallels of latitude of the series 70°00′00″, 70°10′00″, 70°20′00″, which series may be extended as required.

  • (3) Every grid area shall be referred to by the latitude and longitude of the northeast corner of that grid area.

  •  (1) Between latitudes 40° and 60° and between latitudes 70° and 75° the boundary

    • (a) between the north and south halves of a grid area is the north boundary of sections 5, 15, 25, 35, 45, 55, 65, 75, 85 and 95; and

    • (b) between the east and west halves of a grid area is the west boundary of sections 41 to 50.

  • (2) Between latitudes 60° and 68° and between latitudes 75° and 78° the boundary

    • (a) between the north and south halves of a grid area is the north boundary of sections 5, 15, 25, 35, 45, 55, 65 and 75; and

    • (b) between the east and west halves of a grid area is the west boundary of sections 31 to 40.

  • (3) Between latitudes 68° and 70° and between latitudes 78° and 85° the boundary

    • (a) between the north and south halves of a grid area is the north boundary of sections 5, 15, 25, 35, 45 and 55; and

    • (b) between the east and west halves of a grid area is the west boundary of sections 21 to 30.

  •  (1) Every grid area shall be divided into sections.

  • (2) A section shall be bounded on the east and west sides by meridians spaced,

    • (a) in the case of a section within a grid area, the whole or greater part of which lies between latitudes 40° and 60° or between latitudes 70° and 75°, at intervals of one-tenth of the interval between the east and west boundaries of the grid area;

    • (b) in the case of a section within a grid area, the whole or greater part of which lies between latitudes 60° and 68° or between latitudes 75° and 78°, at intervals of one-eighth of the interval between the east and west boundaries of the grid area; and

    • (c) in the case of a section within a grid area, the whole or greater part of which lies between latitudes 68° and 70° or between latitudes 78° and 85°, at intervals of one-sixth of the interval between the east and west boundaries of the grid area.

  • (3) A section shall be bounded on the north and south sides by straight lines drawn parallel to the north and south boundaries of the grid area and spaced at intervals of one-tenth of the interval between the north and south boundaries of the grid area.

  • (4) A section shall be identified by the number to which it corresponds,

    • (a) in the case of a grid area described in paragraph (2)(a), as follows:

      100908070605040302010
      49
      48
      47
      46
      9585756555453525155
      44
      43
      42
      9181716151413121111
    • (b) in the case of a grid area described in paragraph (2)(b), as follows:

      8070605040302010
      39
      38
      37
      36
      756555453525155
      34
      33
      32
      716151413121111
    • (c) in the case of a grid area described in paragraph (2)(c), as follows:

      605040302010
      29
      28
      27
      26
      55453525155
      24
      23
      22
      51413121111
  •  (1) Every section shall be divided into units.

  • (2) Every unit shall be bounded on the east and west sides by meridians spaced at intervals of one-quarter of the interval between the east and west boundaries of the section.

  • (3) Every unit shall be bounded on the north and south sides by straight lines drawn parallel to the north and south boundaries of the section and spaced at intervals of one-quarter of the interval between the north and south boundaries of the section.

  • (4) Every unit shall be identified by the letter to which it corresponds in the following diagram:

    MNOP
    LKJI
    EFGH
    DCBA

 All latitudes and longitudes used in these Regulations shall be referred to the North American Datum of 1927.

  • SOR/80-590, s. 2
.

Surveys

  •  (1) Subject to these Regulations, the provisions of The Canada Lands Surveys Act apply to any legal survey made pursuant to these Regulations.

  • (2) No person shall make a legal survey of Canada lands other than a Canada Lands Surveyor.

  • (3) A Canada Lands Surveyor may enter upon a permit area, lease area or development structure for the purpose of making a legal survey or other positional surveys if he gives prior written notice to the Chief.

  • (4) The lessee, permittee, holder or operator Of a development structure shall give reasonable assistance to a Canada Lands Surveyor entering under subsection (3).

  • (5) Any legal survey shall be authorized and paid for by the permittee, holder or lessee as the case may be.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 102(F)
.
  •  (1) Every plan of legal survey shall be signed by the surveyor and submitted to the Surveyor General together with the surveyor’s field notes annexed to an affidavit of the surveyor verifying that he has executed the legal survey faithfully, correctly and in accordance with these Regulations and with any instructions issued to him by the Surveyor General.

  • (2) Every plan of legal survey shall, where relevant, show

    • (a) the position, direction and length of the boundaries of grid areas and divisions thereof;

    • (b) the position of existing wells;

    • (c) the nature and position of any monument used to mark, or placed as a reference to, any boundary or position referred to in paragraph (a) or (b); and

    • (d) any road allowance, surveyed road, railway, pipeline, high voltage power lines or other right of way, dwellings, industrial plants, permanent buildings, air fields and existing or proposed fight ways.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.
  •  (1) Where any uncertainty or dispute arises respecting the position of any well or boundary, the Chief may require a permittee, holder or lessee to file a plan of legal survey, approved by the Surveyor General, showing the well or boundary in respect of which the uncertainty or dispute has arisen.

  • (2) A plan of legal survey shall show the position of such wells, boundaries and references as the Chief may specify.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.

 The Surveyor General may, at the request of a permittee, lessee or holder, approve a plan of legal survey of the whole or part of a grid area, permit area, lease area, section, unit or the position of a well.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.

Monuments

 The ground position of a grid area, permit area, lease area, section, unit or well may, in the discretion of the Surveyor General, be surveyed by reference to

  • (a) a monument shown on a plan of legal survey that has been approved by the Surveyor General;

  • (b) a geodetic survey triangulation station;

  • (c) a geodetic survey Shoran station;

  • (d) a marker placed for the purpose of marking a territorial boundary;

  • (e) a monument as defined in the Dominion Lands Surveys Act or the Canada Lands Surveys Act;

  • (f) a physical feature, the geographical position of which has been determined by means of a Shoran-controlled photogrammetric process;

  • (g) a marker, the geographic position of which has been determined by astronomic means; or

  • (h) any other marker approved by the Surveyor General.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.
  •  (1) Where a monument shown on a plan of legal survey is damaged, destroyed, moved or altered as a result of the operations of a licensee, permittee, holder or lessee, he shall report the matter to the Chief as soon as possible and shall

    • (a) pay to the Receiver General of Canada the cost of restoration or re-establishment of the monument; or

    • (b) with the consent of the Surveyor General, cause the monument to be restored or re-established at his own expense.

  • (2) Every permittee, lessee or holder shall maintain and keep in good repair all monuments that are located on or mark the boundaries of his permit area or lease area as the case may be.

  • (3) The restoration or re-establishment of a monument under subsection (1) shall be done by a Canada Lands Surveyor under the instruction of the Surveyor General.

  • (4) A permittee, lessee or holder shall give the Surveyor General and the Chief at least three months notice of any planned movement of an offshore development structure to which legal survey monuments have been attached and such movement shall not constitute movement of the monuments under subsection (1).

  • (5) A licensee, permittee, lessee or holder shall report the destruction, damage to, movement or alteration of any monument to the Chief forthwith after he has knowledge of it.

  • SOR/80-590, s. 3
  • 1998, c. 14, ss. 101(F), 102(F)
.

 Where the position of any boundary of a grid area, permit area, lease area, section or unit or the position of a well has been established by a legal survey approved by the Surveyor General pursuant to these Regulations, the position of that boundary or well so established shall be deemed to be the true position thereof, notwithstanding that the boundary or well is found not to be located in the position required by these Regulations and shall determine the position of all other sections or units that lie within the grid area.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.
  •  (1) Where, owing lo a discordance of reference points or imprecisions in measuring, a subsequently surveyed grid area, section or unit appears to overlap a grid area, section or unit the position of which is deemed to be true by section 16, the subsequently surveyed grid area, section or unit shall be laid out and surveyed as though no overlap existed except that it shall be reduced by that portion that lies within the overlap.

  • (2) Subject to subsection (1), a grid area that has been reduced pursuant to subsection (1) shall, for the purpose of these Regulations, be considered to be a whole grid area.

  • (3) Where, owing to a discordance of reference points or imprecisions in measuring, a parcel of Canada lands appears not to lie within a grid area, that parcel may be disposed of pursuant to subsection 30(7) or section 57.

  • SOR/80-590, s. 3
.

Exploration Wells

 Every licensee, permittee, holder or lessee shall, before drilling an exploratory well offshore, send to the Oil Conservation Engineer three prints of a tentative plan showing the locations of the proposed drilling and a description of the system and method of positioning the well.

  • SOR/80-590, s. 3
.
  •  (1) Every permittee, holder or lessee shall, before the suspension or abandonment of any exploratory well, send to the Oil Conservation Engineer a plan that clearly shows the surveyed position of that well relative to

    • (a) a reference point referred to in section 14; or

    • (b) a topographical feature that is identifiable on

      • (i) a map that has been published by or on behalf of the Government Of Canada within three years immediately preceding the date on which the plan is submitted, or

      • (ii) a vertical aerial photograph, of mapping standard, obtained from the National Air Photo Library or from such other source as may be acceptable to the Surveyor General.

  • (2) Where an aerial photograph is used pursuant to paragraph (1)(b), that photograph shall be sent to the Oil Conservation Engineer together with the plan.

  • (3) A permittee, lessee or holder may, in lieu of the plan referred to in subsection (1), send to the Oil Conservation Engineer the aerial photograph referred to in subparagraph (1)(b)(ii) on which the surface position of the exploratory well has been clearly marked in a manner acceptable to the Surveyor General, after the position thereof has been determined by a field comparison between the site and the photograph.

  • (4) Where a suspended or abandoned exploratory well is offshore, the electrical centres and other shore stations from which the position of the well was determined shall be permanently marked and the plan referred to in subsection (1) shall be accompanied by a report on the survey system describing all assumed parameters of the survey system and the shore station markings.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.

 Every licensee permittee, lessee or holder shall, as soon as possible after an exploratory well is completed, send to the Oil Conservation Engineer three prints of a legal survey, approved by the Surveyor General showing the surface position of the well and the boundaries of the unit and section in which the well is located.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.

Development Wells

  •  (1) Every permittee, lessee or holder shall, before drilling a development well, send to the Oil Conservation Engineer three prints of a tentative plan showing the approximate surface position of the proposed well and the proposed location of the well at total depth.

  • (2) In the case of a development well on land, the permittee, lessee or holder shall

    • (a) within sixty days of commencing drilling, submit to the Surveyor General for approval a plan of legal survey showing the surface position of the well and the boundaries of the unit and section in which the well is located; and

    • (b) on request of the Chief, submit three prints of a plan showing the locus of the drillhole with respect to the unit and section boundaries.

  • (3) In the case of a fixed offshore development structure, the permittee, lessee or holder shall

    • (a) as soon as possible after the erection of the development structure, submit to the Surveyor General for approval a plan of legal survey showing the unit and section in which the structure is situated and the positions of at least two monuments of the legal survey permanently fixed to the structure; and

    • (b) on request of the Chief, submit three prints of a plan showing the locus of the drillhole with respect to the unit and section boundaries and the position of the monuments of the legal survey.

  • SOR/80-590, s. 3
  • 1998, c. 14, s. 101(F)
.
  •  (1) A tentative plan shall be approved by the Chief prior to the construction, alteration or extension of any work or works in the offshore that will, on completion thereof form all or part of an undertaking for the production, gathering, storing, processing transmission or other handling of oil and gas and such plans shall show the proposed work or works and the system of survey to be used in positioning the work or works.

  • (2) A final plan satisfactory to the Chief shall, on his request, be submitted to him within six months from the completion of any part of an undertaking described in subsection (1).

  • SOR/80-590, s. 3
.

Prohibition

  •  (1) No person shall, for the purpose of searching for oil or gas, carry out exploratory work on Canada lands except as authorized by these Regulations.

  • (2) No person shall produce, mine, quarry or extract from Canada lands any oil, gas or other minerals or substances that are produced, mined, quarried or extracted in association with any oil or gas except as authorized by these Regulations.

Loading…