Nunavut Planning and Project Assessment Act

S.C. 2013, c. 14, s. 2

In forceCurrent to September 30, 2026 History

Loading…

Part 3 — Assessment of Projects to Be Carried Out in the Designated Area

ss. 129 to 183

Review

Federal Environmental Assessment Panel

Marginal note:Consultation

 If a department or agency has indicated to the responsible Minister that the project involves an interest within their jurisdiction, that Minister must consult with that department or agency before making any decision under section 125 or 126, subsection 127(3) or (4) or section 128.

Marginal note:Approval of Governor in Council

 Any decision of the responsible Minister made under subparagraph 125(a)(i), paragraph 125(b) or 126(a), subsection 127(3) or (4) or section 128 in relation to a project referred to in subparagraph 94(1)(a)(i) requires the approval of the Governor in Council.

Marginal note:Notification by Minister

 The responsible Minister must, as soon as practicable, notify the Board in writing of the terms and conditions, established in accordance with sections 125 to 130, that are to apply in respect of a project.

Marginal note:Project certificate

  •  (1) Within 30 days after receiving the notice under section 131, the Board must issue a project certificate that sets out the terms and conditions contained in that notice.

  • Marginal note:Application of subsections 111(2) to (4)

    (2) Subsections 111(2) to (4) apply in respect of the project certificate issued under subsection (1).

  • Marginal note:Extension of time limit

    (3) If the responsible Minister is of the opinion that more time is needed for the Board to issue the project certificate, that Minister may extend the period referred to in subsection (1) by up to 45 days and must notify the proponent and the Board of the extension in writing.

  • Marginal note:Reconsideration of terms and conditions

    (4) Sections 112 and 114 apply in respect of the review of the terms and conditions and the issuance of an amended project certificate, and in paragraph 112(6)(b) the reference to section 108 is a reference to section 128.

Marginal note:Location of impacts

 The ecosystemic and socio-economic impacts of the project both inside and outside of the designated area must be taken into account for the purposes of sections 120 to 132.

Project Terms and Conditions

Compatibility

Marginal note:Prescribed standards

 In exercising the powers and performing the duties and functions relating to terms and conditions that are to apply in respect of a project, the responsible Minister must not accept or impose terms and conditions that would be inconsistent with any standard established by any environmental or socio-economic Act of Parliament of general application or territorial law of general application or by any regulation of general application made under such an Act or law.

Monitoring Programs

Marginal note:Impacts of project

  •  (1) The responsible Minister may, in establishing terms and conditions that are to apply in respect of a project, require the establishment of a monitoring program of the project’s ecosystemic and socio-economic impacts.

  • Marginal note:Responsibilities

    (2) The Government of Canada, the Government of Nunavut, the Board and the proponent must each carry out any responsibilities assigned to them under the monitoring program.

  • Marginal note:Purpose of program

    (3) The purpose of a monitoring program is to

    • (a) measure the impact of the project on the ecosystemic and socio-economic environments of the designated area;

    • (b) determine whether the project is carried out in accordance with the terms and conditions imposed under subsection 152(6) or set out in the original or amended project certificate;

    • (c) provide the information necessary for regulatory authorities to enforce the terms and conditions of licences, permits or other authorizations that they issue in relation to the project; and

    • (d) assess the accuracy of the predictions contained in the project impact statement.

  • Marginal note:Requirements of program

    (4) A monitoring program must specify the elements to be monitored and may include the requirement that

    • (a) regulatory authorities and the proponent provide the Board with information respecting the activities relating to a project, its impacts and the implementation of any mitigative measures;

    • (b) the Board carry out periodic evaluations of the program; and

    • (c) the Board produce a report of the adequacy of the program, based on the information obtained under paragraph (b), and on the ecosystemic and socio-economic impacts of the project.

  • Marginal note:Other responsibilities

    (5) For greater certainty, federal and territorial ministers and departments or agencies must fulfil any other responsibilities respecting monitoring of projects and data collection imposed on them by or under any other Act of Parliament or territorial law.

  • Marginal note:No duplication of responsibilities

    (6) There must be no duplication of responsibilities between those assigned to the Board under a monitoring program and those referred to in subsection (5).

Implementation

Marginal note:Duty — general

  •  (1) Each federal or territorial minister, each department or agency and each municipality must, to the extent of their jurisdiction and authority to do so, implement the terms and conditions that are set out in an original or amended project certificate.

  • Marginal note:Limit to duty

    (2) Nothing in subsection (1) requires the amendment of any Act of Parliament or territorial law or any regulation as defined in section 1.1.1 of the Agreement.

Marginal note:Duty — licences, etc.

  •  (1) Each regulatory authority must, to the extent of its jurisdiction and authority to do so, incorporate the terms and conditions referred to in subsection 136(1) into any licence, permit or other authorization that it issues.

  • Marginal note:Other terms and conditions

    (2) For greater certainty, a regulatory authority may impose, to the extent of its jurisdiction and authority to do so, terms and conditions that are in addition to, or more stringent than, those referred to in subsection 136(1) and subsection (1) does not prevent a regulatory authority from refusing to issue a permit, licence or other authorization.

  • Marginal note:Consultation

    (3) A regulatory authority must consult the Board with a view to determining the most effective means of implementing the terms and conditions referred to in subsection (1) and may, for that purpose, send a draft licence, permit or other authorization to the Board in order to obtain its comments and recommendations.

  • Marginal note:Copy to Board and Commission

    (4) A regulatory authority must send a copy of each licence, permit or other authorization referred to in subsection (1) to the Board and the Commission, unless the Board or the Commission, as the case may be, exempts that authority from the requirement to provide it with copies.

  • Marginal note:Validity of licence, etc.

    (5) The validity of a licence, permit or other authorization is not to be challenged before a court on the grounds that a regulatory authority fettered its discretion or acted without jurisdiction by incorporating the terms and conditions referred to in subsection (1) into it.

Marginal note:Prevailing terms and conditions

 Terms and conditions referred to in subsection 136(1) prevail over any conflicting terms and conditions set out in any decision of a regulatory authority.

Marginal note:Decision of independent regulatory agency

  •  (1) If there is an inconsistency between the terms and conditions referred to in subsection 136(1) and those set out in a decision of an independent regulatory agency, that agency must communicate the reasons for the inconsistency to the responsible Minister, the Board and the Governor in Council.

  • Marginal note:Exception — prevailing terms and conditions

    (2) Despite section 138, if there is a conflict between the terms and conditions referred to in subsection 136(1) and those set out in a decision of an independent regulatory agency, the terms and conditions set out in the decision of the independent regulatory agency prevail if

    • (a) the government does not have the power to amend the agency’s decision and the Governor in Council is of the opinion that the project is in the national or regional interest; or

    • (b) the government has the power to amend the agency’s decision and the Governor in Council is of the opinion that the project is in the national or regional interest and implementing the terms and conditions referred to in subsection 136(1) would undermine the viability of the project.

  • Marginal note:Amended certificate

    (3) Within 45 days after the day on which a decision is made by the Governor in Council under paragraph (2)(a) or (b), the Board must issue an amended project certificate and the terms and conditions set out in the certificate must be consistent with those set out in the decision of the independent regulatory agency.

  • Marginal note:Non-application of subsections (2) and (3)

    (4) For greater certainty, subsections (2) and (3) do not apply if the terms and conditions are varied under section 112 and, as a result, the conflict referred to in subsection (2) is resolved.

  • Marginal note:Definition

    (5) For the purposes of this section, decision of an independent regulatory agency means a decision made by any body established under a federal or territorial law under a power conferred on it to regulate or to issue licences, permits or other authorizations if that body is not subject to specific direction or control by the Government of Canada or Government of Nunavut.

  • Marginal note:Interpretation

    (6) A decision

    • (a) does not cease to be a decision of an independent regulatory agency solely because

      • (i) it is subject to general direction by the Government of Canada or the Government of Nunavut through the issuance of guidelines, regulations or directives, or

      • (ii) it is subject to the approval of, or may be varied or rescinded by, the Government of Canada or the Government of Nunavut; and

    • (b) ceases to be a decision of an independent regulatory agency if the Government in question varies it before reasons are communicated under subsection (1).

Marginal note:Inuit Impact and Benefit Agreements

 Any Inuit Impact and Benefit Agreement entered into by a proponent and the designated Inuit organization under Article 26 of the Agreement must be consistent with the terms and conditions set out in an original or amended project certificate.

General Provisions

Modifications to Project During Assessment

Marginal note:Notice — proponent

  •  (1) A proponent must, as soon as practicable, notify the Commission in writing of any significant modification to a project that is under assessment under this Part. The notice must include a description of the modification that is prepared in accordance with the by-laws and rules made under paragraph 17(1)(e).

  • Marginal note:New assessment

    (2) On receipt of a notice under subsection (1), the assessment of the original project is terminated and an assessment of the modified project must be carried out under this Part as if the Commission had received a project proposal under section 76.

  • Marginal note:Consideration of previous assessment

    (3) The person or body exercising powers or performing duties or functions under this Part in respect of the modified project must consider, and may rely on, any assessment activities carried out under this Part in respect of the original project.

Marginal note:Notice — authority assessing project

  •  (1) If, in the exercise of its powers or the performance of its duties and functions under this Part, the Commission, the Board, a federal environmental assessment panel or a joint panel, as the case may be, determines that the proponent has made a significant modification to a project that is under assessment under this Part, it must, as soon as practicable, notify the proponent in writing of the requirement set out under subsection 141(1).

  • Marginal note:Termination of assessment

    (2) If the proponent does not provide a notice under subsection 141(1) within 30 days after the day on which the notice was given under subsection (1), the assessment of the project is terminated.

  • Marginal note:Interpretation

    (3) For greater certainty, the proponent may submit a project proposal in relation to the modified project in accordance with section 76.

  • Marginal note:Consideration of previous assessment

    (4) The person or body exercising powers or performing duties or functions under this Part in respect of the modified project must consider, and may rely on, any assessment activities carried out under this Part in respect of the original project.

Requests During Assessment

Marginal note:Request — suspension

  •  (1) The proponent may request in writing that the assessment of a project be suspended. The request may be made to any body exercising powers or performing duties or functions under this Part in respect of the project.

  • Marginal note:Suspension

    (2) As soon as practicable after it receives a request under subsection (1) the body must suspend the assessment of the project. The body must set the date the suspension takes effect after taking into account the proponent’s comments in respect of the suspension.

  • Marginal note:Time not counted

    (3) If the proponent requests a suspension under subsection (1), the period of the suspension does not count as part of any time limit set out in this Part.

  • Marginal note:Resumption or termination of review

    (4) A proponent may request in writing that the assessment resume, and if such a request is not made within three years after the day on which it is suspended, the assessment of the project is terminated.

  • Marginal note:Request — termination

    (5) The proponent may request in writing that the assessment of a project be terminated. The request may be made to any body exercising powers or performing duties or functions under this Part in respect of the project.

  • Marginal note:Termination of review

    (6) The assessment of the project is terminated on the day on which a request under subsection (5) is received.

  • Marginal note:Interpretation

    (7) For greater certainty, the proponent may submit a new project proposal in relation to a project whose assessment has been terminated under subsection (4) or (6), in accordance with section 76.

  • Marginal note:Consideration of previous assessment

    (8) The person or body exercising powers or performing duties or functions under this Part in respect of the project to which the new project proposal relates must consider, and may rely on, any assessment activities carried out under this Part in respect of the project.

Marginal note:Additional information

  •  (1) The Commission, the Board and any federal environmental assessment panel may require the proponent to provide any additional information that it considers necessary to carry out its review or screening or to determine the scope of a project, as the case may be.

  • Marginal note:Suspension

    (2) If the proponent fails to provide material information required under subsection (1), the Commission, the Board or any federal environmental assessment panel may suspend its assessment activities until the proponent provides that information and must make the reasons for the suspension public if it does so.

  • Marginal note:Termination of assessment

    (3) If a proponent does not provide the information referred to in subsection (2) within three years after the day on which the request was made, the assessment of the project is terminated.

  • Marginal note:Interpretation

    (4) For greater certainty, the proponent may submit a new project proposal in relation to the project in accordance with section 76.

  • Marginal note:Consideration of previous assessment

    (5) The person or body exercising powers or performing duties or functions under this Part in respect of the project to which the new project proposal relates must consider, and may rely on, any assessment activities carried out under this Part in respect of the project.

Modifications to Project After Assessment

Marginal note:Modification not significant

 If the carrying out of a work or activity is a project within the meaning of subsection 2(1) and modifies a project that has been approved under this Part, that work or activity is, despite paragraphs 74(a) and (b), not subject to an assessment under this Part unless that work or activity is a significant modification to the original project.

Marginal note:Significant modification

  •  (1) For greater certainty, if the work or activity referred to in section 145 is a significant modification to the original project, it is subject to an assessment under this Part.

  • Marginal note:Previous assessments

    (2) Any person or body exercising powers or performing duties or functions under this Part in relation to the assessment of the modifying project must consider, and may rely on, any assessment carried out under this Part in relation to the original project.

Projects Not Carried Out

Marginal note:New assessment

  •  (1) If a project is not commenced within five years after the day on which the project was approved under this Part, that project is subject to a new assessment under this Part.

  • Marginal note:Prohibition

    (2) It is prohibited to carry out the project referred to in subsection (1) in whole or in part, but the proponent may submit a new project proposal in relation to it in accordance with section 76.

  • Marginal note:Consideration of previous assessment

    (3) The person or body exercising powers or performing duties or functions under this Part in respect of the project referred to in subsection (1) must consider, and may rely on, any assessment activities carried out under this Part in respect of the project.

Consultations

Marginal note:Consultation — Minister

 The responsible Minister must consult with the relevant regulatory authorities in respect of the establishment of terms and conditions, under this Part, that are to apply to the carrying out of a project.

Multiple Responsible Ministers

Marginal note:Joint exercise of powers, etc.

  •  (1) Subject to subsection (2), if there is more than one responsible Minister in respect of a project, they must jointly exercise the powers and perform the duties and functions of the responsible Minister under this Part.

  • Marginal note:Subparagraph 94(1)(a)(i)

    (2) If there is more than one responsible Minister in respect of a project and one or more of those Ministers are territorial ministers and one or more of those Ministers are federal ministers, the reference to responsible Minister in subparagraph 94(1)(a)(i) is a reference to the responsible Minister or Ministers who are federal ministers and, if there is more than one federal minister, they must jointly make a decision under that subparagraph.

  • Marginal note:Coordination and transmission of documents

    (3) In the circumstances described in subsection (1), a proponent, the Board, the federal environmental assessment panel or the joint panel, as the case may be, must send all documents and information that must be sent to the responsible Minister under this Part to the federal Minister and the federal Minister must, as soon as practicable, forward the documents and information to the responsible Ministers.

  • Marginal note:Notice of decisions

    (4) The responsible Ministers must provide reasons for joint decisions made under subsection (1) or (2), and the federal Minister must perform the duties of the responsible Minister under subsection 200(4) in relation to those decisions.

Reasons for Decisions

Marginal note:Written reasons

 Written reasons must be provided with respect to

  • (a) a decision under section 77 that a project is not in conformity with an applicable land use plan;

  • (b) a decision made under any of paragraphs 81(2)(a) and 82(2)(a), sections 93 to 95, 105 and 106, subsections 107(3) and (4) and 112(6) and (7), sections 125 and 126, subsections 127(3) and (4), 142(1), 144(2) and 152(6) and paragraph 155(1)(b);

  • (c) a decision under any of subsections 86(1), 99(1) and 118(1) that has the effect of expanding or restricting the scope of the project; and

  • (d) a determination in an original or amended report that is prepared by the Board, a federal environmental assessment panel or a joint panel under this Part, other than under subsection 152(4).

Special Cases

National Security

Marginal note:Non-application of this Part

 The Minister of National Defence may, on an exceptional basis, make a decision to exempt from the application of this Part the carrying out of any work relating to an installation or facility, or the undertaking or carrying out of any activity, that constitutes a project within the meaning of subsection 2(1) and that is required for the purpose of national defence if that Minister certifies in the decision that, for reasons of confidentiality or urgency, an exemption is required in the interest of national security.

Emergency Situations

Marginal note:Non-application of this Part

  •  (1) This Part does not apply in respect of any project that is carried out in response to

    • (a) a national emergency for which special temporary measures are taken under the Emergencies Act;

    • (b) an emergency if a federal or territorial minister who is authorized under any other Act of Parliament or any territorial law to declare a state of emergency, to take measures to prevent an emergency or to remedy or minimize its effects is of the opinion that an emergency exists; or

    • (c) an emergency if the federal Minister certifies that an emergency exists and that it is in the interest of ensuring the health or safety of an individual or the general public, or of protecting property or the environment that the project be carried out without delay.

  • Marginal note:Report — person or entity

    (2) As soon as practicable after undertaking a project referred to in subsection (1), the person or entity carrying it out must submit a written report to the Commission, the Board and the federal Minister describing

    • (a) all of the works or activities that have been undertaken or carried out in response to the emergency referred to in paragraph (1)(a), (b) or (c), as the case may be; and

    • (b) any further works or activities required after the end of that emergency to complete the project or maintain a work referred to in paragraph (a).

  • Marginal note:Report — Commission

    (3) After receiving a report under subsection (2), the Commission may submit a written report to the federal Minister that contains an assessment of the project’s conformity with any applicable land use plan.

  • Marginal note:Report — Board

    (4) After receiving a report under subsection (2), the Board may submit a written report to the federal Minister with terms and conditions that it recommends, with reasons, should apply in respect of the project or any portion of it.

  • Marginal note:Additional information

    (5) The person or entity must provide any additional information that the Commission or the Board considers necessary to prepare its report under subsection (3) or (4), as the case may be.

  • Marginal note:Terms and Conditions

    (6) After receiving a report under subsection (2) and reports under subsections (3) and (4), if any, the federal Minister may impose terms and conditions on the carrying out of the works or activities referred to in paragraph (2)(b), in which case section 135 applies.

  • Marginal note:Prohibition

    (7) It is prohibited to carry out any works or activities referred to in paragraph (2)(b), in whole or in part, in contravention of any term and condition imposed under subsection (6).

Community Resupply and Ship Movements

Marginal note:No screening

  •  (1) The Board must not screen any project if, after determining the scope of the project under subsection 86(1), it is of the opinion that the project either has as its purpose the provision of normal community resupply or consists of individual ship movements not relating to another project.

  • Marginal note:Precision

    (2) Sections 87 to 140 do not apply in respect of a project referred to in subsection (1).

Exploration, Developmental or Development Activities

Marginal note:Licences — Nunavut Water Board

  •  (1) Despite paragraph 75(1)(b), the Nunavut Water Board may issue licences to use waters or deposit waste for an interim, short-term period under the Nunavut Waters and Nunavut Surface Rights Tribunal Act, in respect of exploration or developmental activities that relate directly to a project that is subject to a review under this Part.

  • Marginal note:Conditions

    (2) Despite paragraph 74(b) and subject to paragraph 74(f) and to obtaining the licence referred to in subsection (1) and any other licence, permit or other authorization required by or under any other Act of Parliament or any territorial law and to complying with any other requirements set out in such an Act or law, the proponent may undertake or carry out activities described in subsection (1).

  • Marginal note:Non-renewal, etc.

    (3) Licences referred to in subsection (1) are not to be renewed or amended and their period of validity is not to be extended if the responsible Minister has come to a decision under this Part that the project to which the activities relate either could be modified and an amended project proposal submitted to the Commission or is not to proceed.

Marginal note:Licences — regulatory authorities

  •  (1) Despite paragraph 75(1)(b), a regulatory authority may issue a licence, permit or other authorization in respect of exploration or development activities that relate directly to a project that is subject to a review under this Part if

    • (a) each activity belongs to a class of exempt activities set out in items 1 to 6 of Schedule 12-1 to the Agreement or in Schedule 3 and does not belong to a class of non-exempt activities prescribed by regulation; or

    • (b) the activities may, in the Board’s opinion, proceed without such a review.

  • Marginal note:Conditions

    (2) Despite paragraph 74(b) and subject to paragraph 74(f) and to obtaining any licence, permit or other authorization required by or under any other Act of Parliament or any territorial law and to complying with any other requirements set out in such an Act or law, the proponent may undertake or carry out activities described in subsection (1).

  • Marginal note:Non-renewal, etc.

    (3) Licences, permits or other authorizations referred to in subsection (1) are not to be renewed or amended and their period of validity is not to be extended if the responsible Minister has come to a decision under this Part that the project to which the activities relate either could be modified and an amended project proposal submitted to the Commission or is not to proceed.

Transboundary Projects

Review by Commission

Marginal note:Application — entire project

  •  (1) If a project is to be carried out partly outside the designated area, sections 76 and 80 apply in respect of the entire project.

  • Marginal note:Limitation

    (2) Sections 77 to 79, 81, 82 and, subject to subsection (1), 85 apply only in respect of the portion of the project to be carried out inside the designated area.

Screening by Board

Marginal note:Application — entire project

  •  (1) If a project is to be carried out partly outside the designated area, sections 86 to 98 apply, subject to subsection (2), in respect of the entire project.

  • Marginal note:Limitation — scope of project

    (2) If the Board makes an inclusion under paragraph 86(1)(a) only in respect of works or activities to be undertaken or carried out entirely outside the designated area, subsection 86(3) and section 87 do not apply and the Board must screen the entire project.

Review

Board

Marginal note:Scope of project

  •  (1) If the Board receives a project proposal under subparagraph 94(1)(a)(iii) or subsection 94(3), the Board must determine the scope of the project and the Board must

    • (a) include within the scope of the project, in addition to any work or activity identified in the project proposal, any other work or activity that it considers sufficiently related to the project to form part of it; and

    • (b) exclude from the scope of the project any work or activity identified in the project proposal that it considers insufficiently related to the project to form part of it.

  • Marginal note:Application — entire project

    (2) Subject to subsections (3) to (5), subsections 99(2) and (3) and sections 100 to 114 apply in respect of the entire project.

  • Marginal note:Limitation — scope of project

    (3) If the Board makes an inclusion under paragraph (1)(a) only in respect of works or activities to be undertaken or carried out entirely outside the designated area, subsection 99(3) and section 100 do not apply and the Board must review the entire project.

  • Marginal note:Limitation — Board report

    (4) The responsible Minister may only exercise the powers and perform the duties and functions conferred on that Minister under sections 105 and 106 in relation to the parts of the Board’s report that are applicable to or affect the designated area.

  • Marginal note:Limitation — terms and conditions

    (5) The Board and the responsible Minister may only exercise their powers and perform their duties and functions conferred under sections 107 and 108 in relation to terms and conditions that are applicable to or affect the designated area.

Marginal note:Agreement — coordination

  •  (1) The Board may, with the approval of the federal Minister and after consultation with the responsible Minister, enter into an agreement with any authority having powers, duties or functions in relation to the review of the impacts of the portion of the project to be carried out outside the designated area in respect of the coordination of their reviews.

  • Marginal note:Government of foreign state, etc.

    (2) The federal Minister and the Minister of Foreign Affairs may, after consultation with the Board and the responsible Minister, enter into an agreement referred to in subsection (1) if the authority is a government of a foreign state or of a subdivision of a foreign state, or any institution of such a government, or an international organization of states or any institution of such an organization.

Federal Environmental Assessment Panel or Joint Panel

Marginal note:Ministerial decision

  •  (1) After receiving a project proposal under subparagraph 94(1)(a)(ii), the Minister of the Environment must either

    • (a) establish a federal environmental assessment panel; or

    • (b) after consultation with the federal Minister and the responsible Minister, enter into an agreement with any authority having powers, duties or functions in relation to the review of the impacts of the portion of the project to be carried out outside the designated area respecting a review of the entire project by a joint panel.

  • Marginal note:Agreement with foreign state, etc.

    (2) The Minister of the Environment and the Minister of Foreign Affairs may, after consultation with the federal Minister and the responsible Minister, enter into an agreement referred to in paragraph (1)(b) if the authority is a government of a foreign state or of a subdivision of a foreign state, or any institution of such a government, or an international organization of states or any institution of such an organization.

Marginal note:Federal environmental assessment panel

  •  (1) If the Minister of the Environment establishes a federal environmental assessment panel under paragraph 160(1)(a), that Minister must appoint the members of that panel, including a Chairperson.

  • Marginal note:Composition — aboriginal groups

    (2) If a portion of the project is to be carried out in an area adjacent to the designated area that is used by at least one other aboriginal group, at least one quarter of the members of the federal environmental assessment panel, other than the Chairperson, must be appointed on the recommendation of that group or those groups and the organization referred to in paragraph (a) of the definition designated Inuit organization in subsection 2(1), in accordance with any agreement concluded between them.

  • Marginal note:Application — entire project

    (3) Subsections 115(3) to (5) and, subject to subsections (4) to (6), sections 116 to 133 apply in respect of the entire project.

  • Marginal note:Limitation — scope of project

    (4) If the Minister of the Environment makes an inclusion under paragraph 118(1)(a) only in respect of works or activities to be undertaken or carried out entirely outside the designated area, subsection 118(3) and section 119 do not apply and the federal environmental assessment panel must review the entire project.

  • Marginal note:Limitation — panel report

    (5) The Board and the responsible Minister may only exercise their powers and perform their duties and functions under sections 124 to 126 in relation to the parts of the federal environmental assessment panel’s report that are applicable to or affect the designated area.

  • Marginal note:Limitation — terms and conditions

    (6) The Board and the responsible Minister may only exercise their powers and perform their duties and functions under sections 127 and 128 in relation to terms and conditions that are applicable to or affect the designated area.

Marginal note:Joint panel

  •  (1) If the Minister of the Environment enters into an agreement under paragraph 160(1)(b), subsections 161(2) to (6) apply in respect of the project.

  • Marginal note:Compatibility

    (2) An agreement referred to in subsection (1) must be consistent with the subsections referred to in that subsection.

  • Marginal note:Members

    (3) An agreement referred to in subsection (1) must include rules regarding the appointment of members to the joint panel and the composition of that panel.

  • Marginal note:Interpretation

    (4) In subsections 161(2), (4) and (5) and in the provisions referred to in subsections 161(3) to (6), a reference to the federal environmental assessment panel is a reference to the joint panel.

Parks and Conservation Areas

Projects

Marginal note:Definition of responsible authority

 In sections 164 to 170, responsible authority means, as the case may be,

  • (a) the Parks Canada Agency or any other federal or territorial authority having management and control of a park; or

  • (b) the Parks Canada Agency, in the case of a historic place that is designated under the Historic Sites and Monuments Act and administered by that Agency.

Marginal note:Project proposal

  •  (1) The proponent of a project that is to be carried out, in whole or in part, within a park or a historic place that is designated under the Historic Sites and Monuments Act and administered by the Parks Canada Agency, located inside the designated area, must submit a project proposal to the responsible authority.

  • Marginal note:Contents

    (2) A project proposal must contain a description of the project prepared in accordance with criteria established by the responsible authority.

  • Marginal note:Grouping of related projects

    (3) A proponent who intends to undertake two or more projects that are so closely related that they can be considered to form a single project must submit a single project proposal in respect of those projects, which are deemed to be a single project for the purposes of this Act.

  • Marginal note:Notice

    (4) The responsible authority must send the Commission a notice of receipt for the project proposal. That notice must contain the proponent’s name and a summary of the project that includes a description of its nature and an indication of where it is to be carried out.

Marginal note:Conformity with requirements

 The responsible authority must determine if the project is in conformity with the requirements set out by or under any law for which it has responsibility.

Marginal note:Verification — screening

  •  (1) If the responsible authority determines that the project is in conformity with the requirements set out by or under any law for which it has responsibility, it must verify whether the project is exempt from screening.

  • Marginal note:Exemption from screening

    (2) A project is exempt from screening if each work or activity that comprises the project belongs to a class of exempt works or activities set out in items 1 to 6 of Schedule 12-1 to the Agreement or in Schedule 3 and does not belong to a class of non-exempt works or activities prescribed by regulation.

  • Marginal note:Authority may consult Board

    (3) The responsible authority may request the Board’s opinion as to whether a particular project is exempt from screening.

Marginal note:Project not exempt from screening

 If a project is not exempt from screening, the responsible authority must send the project proposal to the Board in order for it to conduct a screening.

Marginal note:Project exempt from screening

  •  (1) If a project is exempt from screening and the responsible authority has concerns in respect of any cumulative ecosystemic and socio-economic impacts that could result from the impacts of the project combined with those of any other project that has been carried out, is being carried out or is likely to be carried out inside the designated area, or wholly or partly outside the designated area, it must send the project proposal to the Board in order for the Board to conduct a screening of the project.

  • Marginal note:No concerns — cumulative impacts

    (2) If a project is exempt from screening and the responsible authority does not have concerns in respect of the cumulative impacts referred to in subsection (1), it must indicate in the decision that the assessment of the project has been completed and that the proponent may, subject to obtaining any licence, permit or other authorization required by or under any other Act of Parliament or any territorial law and complying with any other requirements set out in such an Act or law, carry out the project.

  • Marginal note:Location of impacts

    (3) In exercising its powers and performing its duties and functions under subsections (1) and (2), the responsible authority must consider impacts both inside and outside of the designated area.

Marginal note:Time limit

  •  (1) The responsible authority must exercise its powers and perform its duties and functions under sections 166 to 168 within 45 days after making a determination under section 165.

  • Marginal note:Time not counted — additional information

    (2) Any time required for the proponent to provide information required under subsection 144(1) as modified by paragraph 170(a) does not count as part of the period referred to in subsection (1).

Marginal note:Application of certain provisions

 Section 73, paragraphs 74(a) to (e) and (g), section 75, subsections 86(1) and (2), sections 87 to 98, subsections 99(1) and (2), sections 100 to 117, subsections 118(1) and (2) and sections 120 to 162 apply in respect of the project subject to the following:

  • (a) in those provisions, a reference to the Commission is a reference to the responsible authority;

  • (b) in paragraphs 74(a) and 75(1)(a) and subsections 141(2), 142(3), 143(7), 144(4), 147(2) and 156(1), the reference to section 76 is a reference to section 164;

  • (c) in paragraphs 74(d), 75(1)(d) and 150(a), a reference to section 77 is a reference to section 165, a reference to an applicable land use plan is a reference to the requirements set out by or under any law for which the responsible authority has responsibility and in paragraphs 74(d) and 75(1)(d), the reference respecting a minor variance or a ministerial exemption does not apply;

  • (d) in subsection 86(1), section 87 and paragraphs 92(3)(a) and 100(a), the references to section 79 and subsection 80(1) are, respectively, references to section 167 and subsection 168(1);

  • (e) if the Board makes an inclusion under paragraph 86(1)(a) or 99(1)(a), the Board must not proceed with the screening or the review, as the case may be, and the responsible authority must exercise its powers and perform its duties and functions under section 165 in relation to the entire project;

  • (f) in paragraph 92(3)(c), the day is the day on which the Board receives a decision from the responsible authority, by reason of paragraph (e), that comes to the conclusion referred to in section 167 or subsection 168(1);

  • (g) in paragraph 93(1)(a) and subsections 111(3) and 155(2), the reference respecting paragraph 74(f) does not apply;

  • (h) in section 98, the reference to sections 88 to 97 is a reference to those sections, taking into account any modifications made to them under this section;

  • (i) if the Minister of the Environment makes an inclusion under paragraph 118(1)(a), the federal environmental assessment panel must not proceed with the review and the responsible authority must exercise its powers and perform its duties and functions under section 165 in relation to the entire project;

  • (j) a federal environmental assessment panel must review the project in relation to which the scope has been determined if the Minister of the Environment has not made an inclusion under paragraph 118(1)(a) or if that Minister made an inclusion under that paragraph and the responsible authority, by reason of paragraph (i), comes to the conclusion referred to in section 167 or subsection 168(1);

  • (k) in subsection 132(2), the reference to subsections 111(2) to (4) is a reference to subsection 111(2), to subsection 111(3), as modified by paragraph (g), and to subsection 111(4);

  • (l) in subsection 139(3), the reference to paragraph 93(1)(a) is a reference to that paragraph as modified by paragraph (g);

  • (m) in paragraph 150(b), the reference to section 93 is a reference to that section as modified by paragraph (g) and the references to paragraphs 81(2)(a) and 82(2)(a) do not apply;

  • (n) in paragraph 150(c) and subsection 153(1), the reference to subsection 86(1) is a reference to that subsection as modified by paragraph (d);

  • (o) in subsection 152(3), the reference to any applicable land use plan is a reference to the requirements set out by or under any law for which the responsible authority has responsibility;

  • (p) in subsection 153(2), the reference to sections 87 to 140 is a reference to those sections, taking into account any modifications made to them under this section;

  • (q) in subsection 156(1), the reference to section 80 is a reference to section 168;

  • (r) in subsection 156(2), the reference to sections 77 to 79 is a reference to sections 165 to 167 and the references respecting sections 81, 82 and 85 do not apply;

  • (s) in subsection 157(1), the reference to sections 86 to 98 is a reference to paragraph (e), subsections 86(1) and (2) and sections 87 to 98, taking into account any modifications made to those provisions under this section;

  • (t) in subsection 157(2), the reference to subsection 86(3) is a reference to paragraph (e) and the reference to section 87 is a reference to that section as modified by paragraph (d);

  • (u) in subsection 158(2), the reference to subsection 99(3) is a reference to paragraph (e) and the reference to sections 100 to 114 is a reference to those sections, taking into account any modifications made to them under this section;

  • (v) in subsection 158(3), the reference to subsection 99(3) is a reference to paragraph (e) and the reference to section 100 is a reference to that section as modified by paragraph (d);

  • (w) in subsection 161(3), the reference to sections 116 to 133 is a reference to paragraphs (i) and (j), sections 116 and 117, subsections 118(1) and (2) and sections 120 to 133;

  • (x) in subsection 161(4), the references to subsection 118(3) and section 119 are, respectively, references to paragraphs (i) and (j); and

  • (y) in subsections 162(1) and (4), the references to subsections 161(3) and (4) are references to those subsections as modified by paragraphs (w) and (x).

Marginal note:Project partly outside park, etc.

 If a project is to be carried out partly outside a park or a historic place designated under the Historic Sites and Monuments Act and administered by the Parks Canada Agency,

  • (a) sections 76, 80, 164 and 168 apply in respect of the entire project;

  • (b) sections 163 and 165 to 167 apply only in respect of the portion of the project to be carried out inside the park or historic place; and

  • (c) sections 77 to 79, 81, 82 and, subject to paragraph (a), 85 apply only in respect of the portion of the project that is to be carried out outside the park or historic place.

Marginal note:Projects inside certain conservation areas

 Sections 73 to 162 apply in respect of a project to be carried out, in whole or in part, within a conservation area located inside the designated area, other than a historic place designated under the Historic Sites and Monuments Act and administered by the Parks Canada Agency.

Establishment, Abolition and Alteration of Area

Interpretation

Marginal note:Ministerial initiative

 If a federal or territorial minister proposes an initiative referred to in subsection 174(1), a reference to a department or agency in subsections 174(1) and (3), 177(6) and 178(1) and (4), section 180 and paragraph 182(a) is a reference to that minister.

Proposal

Marginal note:Duty — department or agency

  •  (1) The department or agency proposing an initiative whose purpose is to establish or abolish a park or a conservation area, in whole or in part inside the designated area, or to expand or reduce its area, in whole or in part within the designated area, must submit a proposal to the Commission.

  • Marginal note:Content of proposal

    (2) The proposal must contain a description of the initiative prepared in accordance with the by-laws and rules made under paragraph 17(1)(e).

  • Marginal note:Notice

    (3) The Commission must publish in its public registry a notice of receipt for the initiative. That notice must contain a summary of the initiative, including a description of its nature and an indication of where it is to be carried out, and the name of the department or agency.

Land Use Plan in Effect

Marginal note:Conformity with plan

  •  (1) The Commission must determine if an initiative is in conformity with any land use plan that is applicable to the place where the initiative is to be carried out.

  • Marginal note:Multiple plans

    (2) If different portions of the initiative are subject to different land use plans, the Commission must determine if each portion is in conformity with the land use plan applicable to it, and if one portion of the initiative is not in conformity with the land use plan applicable to it, the entire initiative is deemed not to be in conformity.

Marginal note:Initiative in conformity with plan

 If the Commission determines that the initiative is in conformity with any applicable land use plan, it must send the proposal relating to the initiative to the Board in order for the Board to conduct a screening.

Marginal note:Initiative not in conformity with plan

  •  (1) If the Commission determines that the initiative is not in conformity with an applicable land use plan, it must verify whether that land use plan authorizes it to grant a minor variance with respect to that initiative and whether the conditions set out in accordance with subsection 48(3), if any, are met.

  • Marginal note:Minor variance permitted

    (2) If the land use plan authorizes the granting of a minor variance and if the conditions, if any, are met, the Commission may, within 20 days after its determination that the initiative is not in conformity with the plan,

    • (a) grant the variance, in which case it must send the proposal relating to the initiative to the Board in order for the Board to conduct a screening; or

    • (b) refuse to grant the variance.

  • Marginal note:Publication

    (3) Before granting a minor variance under paragraph (2)(a), the Commission must make the proposed minor variance public and must do so in a manner designed to promote participation in its examination by the public.

  • Marginal note:Objection

    (4) Any interested person may, within 10 days after the proposed minor variance is made public, indicate to the Commission, in writing, that the proposed minor variance should not be granted because

    • (a) the land use plan does not authorize the granting of the minor variance;

    • (b) the conditions subject to which a minor variance may be granted are not met; or

    • (c) the minor variance is not appropriate, in their opinion, for any other reason that they specify.

  • Marginal note:Reasons taken into account and public review

    (5) The Commission may only grant a minor variance under paragraph (2)(a) after taking into account any reasons for which an interested person has indicated, under subsection (4), that it should not be granted and, if it considers it appropriate to do so, conducting a public review in accordance with the by-laws and rules made under section 17 and taking into account any submissions made during that review.

  • Marginal note:Extension of time limit

    (6) If the Commission is of the opinion that more time is needed to make a decision under subsection (2), it may extend the period referred to in that subsection by up to 10 days and must notify the department or agency of the extension in writing.

Marginal note:Request for ministerial exemption

  •  (1) If the Commission determines that the initiative is not in conformity with an applicable land use plan, the department or agency may request an exemption from the federal Minister or the territorial Minister, or both, taking into account their respective jurisdictions, within 60 days after

    • (a) that determination, if the land use plan does not authorize the granting of a minor variance or if it does and the conditions are not met; or

    • (b) the Commission’s decision to refuse to grant a minor variance.

  • Marginal note:Ministerial decision

    (2) The Minister or Ministers, as the case may be, must, within 120 days after the day on which they receive a request under subsection (1), either

    • (a) grant the exemption, in which case the Commission must make the decision public and send the proposal relating to the initiative to the Board in order for the Board to conduct a screening; or

    • (b) refuse the exemption.

  • Marginal note:Consultation

    (3) An exemption may only be granted after consultation with the Commission, the relevant regulatory authorities and the relevant departments or agencies that are not regulatory authorities.

  • Marginal note:Extension of time limit

    (4) If any Minister referred to in subsection (1) is of the opinion that more time is needed to make a decision, that Minister may extend the period referred to in subsection (2) by up to 60 days and must notify the department or agency and the Commission of the extension in writing.

Marginal note:Time limit

  •  (1) The Commission must exercise its powers and perform its duties and functions under sections 175 and 176 within 45 days after the day on which it receives the proposal in respect of the initiative.

  • Marginal note:Time not counted

    (2) If the Commission determines that an initiative is not in conformity with an applicable land use plan, any time required for the exercise of powers or the performance of duties and functions relating to minor variances and ministerial exemptions does not count as part of the period referred to in subsection (1).

  • Marginal note:Time not counted — public review

    (3) If the Commission conducts a public review under subsection 177(5), any time required to conduct it does not count as part of the period referred to in subsection 177(2).

Marginal note:Time not counted — additional information

 Any time required for the department or agency to provide information required under subsection 144(1) as modified by paragraph 182(a) does not count as part of the periods referred to in subsections 177(2) and (4) and 179(1).

No Land Use Plan

Marginal note:Sending of proposal

 If there is no applicable land use plan, the Commission must, within 10 days after the day on which it receives the proposal in respect of the initiative, send the proposal to the Board in order for the Board to conduct a screening.

Applicable Regime

Marginal note:Application of certain provisions

 Sections 73, 75, 86, 88 to 99, 101 to 146, 148 to 150 and 156 to 162 apply in respect of the initiative, subject to the following:

  • (a) in those sections, a reference to a project is a reference to the initiative and a reference to a proponent is a reference to a department or agency;

  • (b) in paragraph 75(1)(a) and subsections 141(2), 142(3), 143(7), 144(4) and 156(1), the reference to section 76 is a reference to section 174;

  • (c) in paragraph 75(1)(d), the reference to section 77 is a reference to section 175 and the references to paragraphs 81(2)(a) and 82(2)(a) are, respectively, references to paragraphs 177(2)(a) and 178(2)(a);

  • (d) in subsection 86(1) and paragraph 92(3)(a), the reference to “section 79 or subsection 80(1)” is a reference to “section 176 or paragraph 177(2)(a) or 178(2)(a) or section 181”;

  • (e) in subsections 86(3), 99(3) and 118(3), the references to sections 77, 81 and 82 are, respectively, references to sections 175, 177 and 178;

  • (f) the Board must screen the initiative in relation to which it has determined the scope in the manner that it considers appropriate to the nature of the initiative if it makes no inclusion under paragraph 86(1)(a) or if it makes an inclusion under that paragraph and it receives a decision, by reason of subsection 86(3), as modified by paragraph (e), that the entire initiative is in conformity with any applicable land use plan, that a minor variance or a ministerial exemption has been granted in respect of it or that there is no land use plan applicable to it;

  • (g) in paragraph 92(3)(c) and subsection 157(2), the reference to subsection 86(3) is a reference to that subsection as modified by paragraph (e);

  • (h) in paragraph 93(1)(a) and subsection 111(3), the reference respecting paragraphs 74(f) and (g) does not apply;

  • (i) the Board must review the initiative in relation to which it has determined the scope if it makes no inclusion under paragraph 99(1)(a) or if it makes an inclusion under that paragraph and

    • (i) it receives a decision, by reason of subsection 99(3), as modified by paragraph (e), that the entire initiative is in conformity with any applicable land use plan, that a minor variance or a ministerial exemption has been granted in respect of it or that there is no land use plan applicable to it, and

    • (ii) following the new screening, it is determined under subparagraph 94(1)(a)(iv) that the Board must conduct the review of the initiative;

  • (j) in section 119, the reference to subsection 118(3) is a reference to that subsection as modified by paragraph (e);

  • (k) in paragraph 135(3)(b), the reference respecting subsection 152(6) does not apply;

  • (l) in subsection 139(3), the reference to paragraph 93(1)(a) is a reference to that paragraph as modified by paragraph (h);

  • (m) in paragraph 150(a), the reference to section 77 is a reference to section 175;

  • (n) in paragraph 150(b), the references to paragraphs 81(2)(a) and 82(2)(a) are, respectively, references to paragraphs 177(2)(a) and 178(2)(a), the reference to section 93 is a reference to that section as modified by paragraph (h), and the references to subsection 152(6) and paragraph 155(1)(b) do not apply;

  • (o) in paragraph 150(c), the reference to subsection 86(1) is a reference to that subsection as modified by paragraph (d);

  • (p) in paragraph 150(d), the reference respecting subsection 152(4) does not apply;

  • (q) in subsection 156(1), the reference to section 80 does not apply;

  • (r) in subsection 156(2), the reference respecting sections 77 to 79, 81, 82 and 85 is a reference to sections 175 to 178 and 181;

  • (s) in subsection 157(1), the reference to sections 86 to 98 is a reference to paragraph (f) and sections 86 and 88 to 98, taking into account any modifications made to those sections under this section;

  • (t) in subsection 157(2), the reference to section 87 is a reference to paragraph (f);

  • (u) in subsection 158(2), the reference to subsection 99(3) is a reference to that subsection as modified by paragraph (e), the reference to sections 100 to 114 is a reference to paragraph (i) and sections 101 to 114, taking into account any modifications made to those sections under this section;

  • (v) in subsection 158(3), the reference to subsection 99(3) is a reference to that subsection as modified by paragraph (e), and the reference to section 100 is a reference to paragraph (i);

  • (w) in subsection 161(3), the reference to sections 116 to 133 is a reference to those sections, taking into account any modifications made to those sections under this section;

  • (x) in subsection 161(4), the reference to subsection 118(3) is a reference to that subsection as modified by paragraph (e) and the reference to section 119 is a reference to that section as modified by paragraph (j); and

  • (y) in subsections 162(1) and (4), the references to subsections 161(3) and (4) are references to those subsections as modified by paragraphs (w) and (x).

Previous Work

Marginal note:Consideration

 The person or body exercising powers or performing duties or functions under sections 174 to 182 may consider, and rely on, any information collected, or study or analysis carried out, in respect of the initiative by any department or agency so as to ensure efficiency and avoid duplication.