Skip to content

Output-Based Pricing System Regulations

SOR/2019-266

In forceCurrent to September 30, 2026 HistoryRegistered on June 28, 2019Made under: Greenhouse Gas Pollution Pricing Act, Environmental Violations Administrative Monetary Penalties Act

Loading…

ss. 41.3 to 93

Emissions Limit

Marginal note:Presumption

 For the purposes of sections 41.1 and 41.2, if the output-based standard set out in subsection 41.1(2) applies to a unit or group of units for a compliance period for the specified industrial activity set out in paragraph 38(c), column 1, of Schedule 1, that output-based standard will continue to apply to the unit or group of units even if the unit or group of units is not producing electricity from gaseous fuel or has a thermal energy to electricity ratio that is equal to or greater than 0.9.

Marginal note:Coal and electricity

 The person responsible for a covered facility where the specified industrial activities engaged in are both the production of coal by mining coal deposits and the generation of electricity and that is comprised of a unit or a group of units that are registered under the Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations must calculate the GHG emissions limit that applies to the covered facility for each compliance period by adding the emissions limit obtained in subsection 36(1) for that compliance period for the specified industrial activity set out in item 25, column 1, of Schedule 1 and the emissions limit determined under section 41 or 41.2 for that compliance period for the specified industrial activities set out in paragraphs 38(a) to (c), column 1, of that Schedule, expressed in CO2e tonnes.

Marginal note:New covered facilities

  •  (1) If, on January 1 of a compliance period, a covered facility has not completed two calendar years of production following the date of first production, sections 36 to 42 do not apply to the covered facility for that compliance period.

  • Marginal note:Primary activity

    (2) Subsection (1) only applies to a covered facility whose primary activity is a specified industrial activity.

  • Marginal note:New electricity generation facility

    (3) Subsection (1) does not apply to an electricity generation facility that begins generating electricity on or after January 1, 2021.

  • Marginal note:Date of production

    (4) For the purposes of subsection (1), to determine the date of first production for a covered facility all industrial activities that the facility has previously been or is currently engaged in must be taken into account.

Assessment

Marginal note:Assessment of emissions against emissions limit

  •  (1) The person responsible for a covered facility must assess for each compliance period the quantity of GHGs that are emitted from the covered facility during the applicable compliance period against its applicable GHG emissions limit in accordance with the formula

    A – B

    where

    A
    is the quantity of GHGs that are emitted from the covered facility during the compliance period, expressed in CO2e tonnes, determined in accordance with subsection 35; and
    B
    is the applicable GHG emissions limit for the covered facility for the compliance period, expressed in CO2e tonnes, determined in accordance with sections 36, 36.1, 36.2, 41, 41.1, 41.2 or 42.
  • Marginal note:Rounding

    (1.1) The result of the assessment in subsection (1) is to be rounded to the nearest whole number or, if the number is equidistant between two whole consecutive numbers, to the higher number.

  • Marginal note:New covered facilities

    (2) If, on January 1 during a compliance period, the covered facility has not completed two calendar years of production following the date of first production, subsection (1) does not apply to the covered facility for that compliance period.

  • Marginal note:Primary activity

    (3) Subsection (2) only applies to a covered facility whose primary activity is a specified industrial activity.

  • Marginal note:New electricity generation facility

    (4) Subsection (2) does not apply to an electricity production facility that begins generating electricity on or after January 1, 2021.

  • Marginal note:Date of production

    (5) For the purposes of subsection (2), to determine the date of first production for a covered facility all industrial activities that the facility has previously been or is currently engaged in must be taken into account.

  • SOR/2021-197, s. 17
.

Records

Marginal note:Content

  •  (1) The person responsible for a covered facility must keep a record of the following information with respect to the covered facility and each unit within it, if applicable, for each compliance period

    • (a) the total quantity of GHGs from each specified emission type;

    • (b) the quantity of each GHG from each specified emission type;

    • (c) all data used for a calculation made under these Regulations, for each specified emission type and GHG, including data used to estimate missing data;

    • (d) all sampling, analysis and measurement data for each specified emission type and GHG;

    • (e) the methods used to quantify, sample, analyze and measure each specified emission type;

    • (f) the methods and data used to quantify production;

    • (g) the procedural changes made in data collection and calculations and changes to measuring devices used to quantify GHGs or production;

    • (h) the quantity of each GHG not included in the total quantity of GHGs under section 23 and the relevant specified emission type;

    • (i) the quantities of CO2 captured, transported or stored expressed in tonnes and the data used to quantify that CO2;

    • (j) the output-based standard calculated under section 37 for each specified industrial activity and all methods and data used to calculate that output-based standard;

    • (k) documents that demonstrate the maintenance, calibration and operation of measuring devices was done in accordance with these Regulations;

    • (l) if the person responsible for a covered facility sells thermal energy that was produced at the covered facility to other covered facilities or buys thermal energy from other covered facilities,

      • (i) the sales invoices or receipts for the thermal energy bought or sold,

      • (ii) the name of any covered facility from which thermal energy is bought or to which it is sold and the covered facility certificate number that was issued to the covered facility, and

      • (iii) the methods and data used to quantify the quantity of thermal energy bought or sold and the data in relation to the ratio of heat from the combustion of fossil fuel;

    • (m) any errors or omissions identified and the measures taken to correct them, with all supporting data and documentation;

    • (n) a copy of all permits issue pursuant to section 28; and

    • (o) documentation that demonstrates that the CO2 was captured, transported and stored in accordance with the laws of Canada or a province or of the United States or one of its States.

  • Marginal note:Continuous Emissions Monitoring System

    (2) For each compliance period during which a person responsible for the covered facility uses a continuous emissions monitoring system, they must comply with the record keeping requirements set out in Quantification Methods.

  • Marginal note:Availability of information

    (3) The record must be kept within 30 days after the information becomes available.

  • Marginal note:Provision of records

    (4) A person who is required to keep a record of information under subsection (1), must, on the Minister’s request, provide a copy of that record to the Minister without delay.

  • SOR/2023-240, s. 28
.

Marginal note:Electronic submission

  •  (1) Any information that is required to be provided to the Minister under these Regulations with respect to a covered facility must be submitted electronically in the form and format specified by the Minister and must bear the electronic signature of the person responsible for the covered facility or of their authorized official.

  • Marginal note:Provision on paper

    (2) If the Minister has not specified an electronic form and format or if it is not feasible to submit the information in accordance with subsection (1) because of circumstances beyond the control of the person responsible for the covered facility or their authorized official, the information must be submitted on paper, signed by the person responsible for the covered facility or their authorized official, in the form and format specified by the Minister. However, if no form and format has been so specified, it may be in any form and format.

Marginal note:Retention of information

  •  (1) The person responsible for a covered facility must retain a record that contains the information set out in section 45, any information that the Minister specifies under subsection 187(2) of the Act and a copy of information submitted to the Minister under these Regulations, including any calculations, measurements and other data on which the information is based.

  • Marginal note:Location of records

    (2) The records, copies and documents must be retained at the principal place of business in Canada of the person responsible for the covered facility or, on notification to the Minister, at any other place in Canada where they can be inspected.

  • Marginal note:Relocation of records

    (3) If the records, copies or supporting documents are moved, the person responsible for the covered facility must notify the Minister, in writing, of the civic address of the new location within 30 days after the day of the move.

  • SOR/2021-197, s. 18
.

Marginal note:Obligation to notify

 The person responsible for the covered facility must notify the Minister, in writing, within 30 days after a change to any of the following:

  • (a) the administrative information set out in sections 1 and 2 of Schedules 2 and 5 and provided to the Minister under these Regulations;

  • (b) the facility’s perimeter;

  • (c) the information provided in an application for registration under subsection 171(1) of the Act or in a request for designation under subsection 172(1) of the Act; or

  • (d) the information provided in an application for a permit under section 27, if the permit is still valid.

Verification Report

Marginal note:Verification body

  •  (1) To be authorized to verify an annual report or a corrected report, a third party must

    • (a) meet the following accreditation requirements:

      • (i) it is accredited as a verification body to the ISO Standard 14065 by the Standards Council of Canada, the ANSI National Accreditation Board or any other accreditation organization that is a member of the International Accreditation Forum,

      • (ii) it has a scope of accreditation that is sufficient to verify the annual report or the corrected report, and

      • (iii) it is not suspended by an accreditation organization that issued an accreditation; and

    • (b) conduct the verification in accordance with the version of ISO Standard 14064-3 published by the International Organization for Standardization in 2006 and entitled Greenhouse gases — Part 3: Specification with guidance for the validation and verification of greenhouse gas assertions, the version of that Standard, published in 2019 and entitled Greenhouse gases — Part 3: Specification with guidance for the verification and validation of greenhouse gas statements, or the subsequent published version, set out in their accreditation, by applying methods that allow it to make a determination to a reasonable level of assurance, as defined in that standard, on whether

      • (i) a material discrepancy exists with respect to the total quantity of GHGs and production reported in the annual report from each specified industrial activity that is used in the calculation of the emissions limit, and

      • (ii) in the verification body’s opinion, the annual report or corrected report was prepared in accordance with these Regulations.

  • Marginal note:Material discrepancy

    (2) For the purpose of the verification of a covered facility’s annual report or corrected report, a material discrepancy exists when

    • (a) with respect to GHGs from covered facilities that have emitted a quantity of GHGs of less than 500 kt of CO2e during the compliance period,

      • (i) in the case of an error or omission respecting GHGs that is identified during the verification and that may be quantified, the result, expressed as a percent, determined by the formula, is equal to or greater than 5%:

        A ÷ B × 100

        where

        A
        is the absolute value of the overstatement or understatement resulting from the error or omission, expressed in CO2e tonnes, and
        B
        is the total quantity of GHGs reported in the annual report or corrected report, expressed in CO2e tonnes, and
      • (ii) in the case of the aggregate of all errors and omissions respecting GHGs that are identified during the verification and that may be quantified, the result, expressed as a percent, determined by the formula, is equal to or greater than 5%:

        A ÷ B × 100

        where

        A
        is the absolute value of the net result of all overstatements and understatements resulting from all errors and omissions, expressed in CO2e tonnes, and
        B
        is the total quantity of GHGs reported in the annual report or corrected report, expressed in CO2e tonnes;
    • (b) with respect to GHGs from covered facilities that emitted a quantity of GHGs that is equal to or greater than 500 kt of CO2e during the compliance period,

      • (i) in the case of an error or omission respecting GHGs that is identified during the verification and that may be quantified, the result, expressed as a percent, determined by the formula, is equal to or greater than 2%:

        A ÷ B × 100

        where

        A
        is the absolute value of the overstatement or understatement resulting from an error or omission, expressed in CO2e tonnes, and
        B
        is the total quantity of GHGs reported in the annual report or corrected report, expressed in CO2e tonnes, and
      • (ii) in the case of the aggregate of all errors and omissions respecting GHGs that are identified during the verification and that may be quantified, the result, expressed as a percent, determined by the formula, is equal to or greater than 2%:

        A ÷ B × 100

        where

        A
        is the absolute value of the net result of all overstatements and understatements resulting from all errors and omissions, expressed in CO2e tonnes, and
        B
        is the total quantity of GHGs reported in the annual report or corrected report, expressed in CO2e tonnes; and
    • (c) with respect to the production from a specified industrial activity that is used in the calculation of the emissions limit, in the case of an error or omission respecting the quantification of the production that is identified during the verification and may be quantified, the result, expressed as a percent, determined by the formula, is equal to or greater than 5%:

      A ÷ B × 100

      where

      A
      is the absolute value of the overstatement or understatement resulting from an error or omission expressed in the applicable unit of measure, and
      B
      is the production from the specified industrial activity in question that is reported in the annual report or corrected report, expressed in the applicable unit of measure.
  • SOR/2021-197, s. 19
  • SOR/2023-240, s. 29
.

Marginal note:Conflict of interest

  •  (1) The person responsible for a covered facility must ensure that no real or potential conflict of interest exists between the person and the accredited verification body, including members of the verification team and any individual or corporate entity associated with the verification body, that is a threat to or compromises the verification body’s impartiality that cannot be effectively managed.

  • Marginal note:Consecutive verifications

    (2) The person responsible must not have their annual report verified by a verification body that has verified six consecutive annual reports prepared under these Regulations with respect to the same covered facility, unless three years have elapsed since the last of those reports was verified. However, a corrected report may be verified by the verification body within those three years if it is in relation to an annual report verified by that verification body.

  • Marginal note:Maximum number of verifications

    (3) The person responsible for a covered facility must not have more than a total of six of its annual reports prepared under these Regulations for the same covered facility verified by the same verification body within a period of nine years.

  • SOR/2021-197, s. 20
.

Marginal note:Facility visit

  •  (1) Subject to subsection (2), the person responsible for a covered facility must ensure that their covered facility is visited by an accredited verification body in the following situations:

    • (a) it is the initial verification of the covered facility under these Regulations or by the verification body;

    • (b) two calendar years have passed since a verification body has visited the covered facility for the purposes of verifying an annual report or corrected report;

    • (c) in the last annual report for the covered facility prepared under these Regulations, the verification body made a determination

      • (i) that a material discrepancy exists with respect to the total quantity of GHGs or production reported in the annual report from a specified industrial activity that is used in the calculation of the emissions limit, or

      • (ii) that the annual report was not prepared in accordance with these Regulations; or

    • (d) the verification body is of the opinion a site visit is required.

  • Marginal note:Other visits

    (2) If buildings that are used for legal, administrative or management purposes are not located where an industrial activity is carried out, the person responsible for a covered facility must ensure that the verification body visits those buildings if data or information necessary for verifying an annual report or a corrected report is kept in those buildings.

  • SOR/2023-240, s. 30
.

Marginal note:Content of verification report

 A verification report is prepared by a verification body in relation to the annual report and corrected report, if applicable, and any related data and information, and includes the information contained in Schedule 5.

Compensation and Compliance Units

Minister’s Intervention

Marginal note:Determination

  •  (1) The Minister may establish the emissions limit or determine the quantity of GHGs emitted from the covered facility for the compliance period if

    • (a) there is a material discrepancy with respect to the total quantity of GHGs from the covered facility or the production from one or more specified industrial activities used in the calculation of the emissions limit reported in the annual report or the corrected report for the compliance period;

    • (b) the verification opinion referred to in paragraph 3(n) of Schedule 5 that is included in the verification report that accompanies an annual report or corrected report for the compliance period indicates that it is impossible to determine that a material discrepancy does not exist or that the annual report or corrected report was prepared in accordance with these Regulations;

    • (c) the emissions limit for the covered facility that is indicated in the annual report or corrected report for the compliance period was not calculated in accordance with these Regulations and any resulting error was equal to or greater than 2%; or

    • (d) the annual report for the compliance period was not submitted to the Minister.

  • Marginal note:Criteria

    (2) The Minister is to establish the emissions limit or determine the quantity of GHGs emitted from the covered facility for the compliance period, as the case may be, based on the following:

    • (a) the annual report and verification report for the compliance period and, if necessary, any previous reports;

    • (b) any report made in accordance with the Notice with respect to reporting of greenhouse gases (GHGs) published under the Canadian Environmental Protection Act, 1999;

    • (c) information in respect of industrial activities, in Canada or in other jurisdictions, similar to those of the covered facility, that allows for the determination of production amounts for the covered facility;

    • (d) accepted quantification methods used to calculate the GHGs from facilities engaged in the same industrial activity or in the same type of industrial activity as the covered facility; and

    • (e) any other information provided, on the Minister’s request, by the person responsible for the covered facility or the verifier.

  • Marginal note:Notice

    (3) The Minister must notify the person responsible for the covered facility, in writing, of their determination with respect to the emissions limit or the quantity of GHGs emitted from the covered facility established for the compliance period.

  • SOR/2023-240, s. 31
.

Compensation and Issuance of Surplus Credits

Marginal note:Excess emissions

 For the purposes of subsection 174(1) of the Act, if, during a compliance period, a covered facility emits GHGs in a quantity that exceeds the applicable emissions limit, the compensation to be provided by the person responsible for that facility is to be established based on the quantity of GHGs, expressed in CO2e tonnes, that was emitted in excess of the emissions limit as reported in the annual report submitted for the compliance period or the Minister’s determination under section 53, as the case may be.

Marginal note:Excess emissions charge payment

  •  (1) Any compensation that is provided by means of an excess emissions charge payment must be made electronically to the Receiver General for Canada.

  • Marginal note:Surplus credits

    (2) Any compensation that is provided by means of a remittance of surplus credits must be made in the manner set out in section 70.

  • Marginal note:Other compliance units

    (3) Any compensation that is provided by means of a remittance of compliance units other than surplus credits must be made in the manner set out in section 71.

Marginal note:Minimum percentage — charge

 A minimum of 25% of the compensation that is required under section 174 of the Act must be provided by means of an excess emissions charge payment for each compliance period beginning with the 2022 compliance period.

  • SOR/2021-197, s. 21
.

Marginal note:Regular-rate compensation deadline

  •  (1) For the purposes of subsection 174(3) of the Act, the regular-rate compensation deadline is December 15 of the calendar year in which the related annual report must be submitted.

  • Marginal note:Exception

    (1.1) Despite subsection (1), for the compliance period that ends on December 31, 2019, the regular-rate compensation deadline is April 15, 2021.

  • Marginal note:Increased-rate compensation deadline

    (2) For the purposes of subsection 174(4) of the Act, the increased-rate compensation deadline is February 15 of the calendar year following the deadline under subsection (1).

  • Marginal note:Exception

    (2.1) Despite subsection (2), for the compliance period that ends on December 31, 2019, the increased-rate compensation deadline is June 15, 2021.

  • Marginal note:Notice referred to in subsection 53(3)

    (3) However, if a notice of determination under subsection 53(3) is issued after October 31 of the year in which the related annual report is due

    • (a) the regular-rate compensation deadline is 45 days after the day on which the notice is issued; and

    • (b) the increased-rate compensation deadline is 60 days after the day on which the regular-rate compensation deadline under paragraph (a) expires.

  • SOR/2020-114, s. 2
.

Marginal note:Compensation information

 A person that is responsible for a covered facility must, at the time compensation is provided, submit to the Minister the following information:

  • (a) the covered facility certificate number;

  • (b) the provision of the Act under which the compensation is being provided;

  • (c) the compliance period for which compensation is being provided;

  • (d) the quantity of GHGs emitted in excess of the emissions limit in respect of which the compensation is provided, expressed in CO2e tonnes;

  • (e) the details of any excess emissions charge payment, including

    • (i) the amount in dollars paid to the Receiver General for Canada,

    • (ii) the applicable rate, and

    • (iii) the date of payment;

  • (f) the details of any surplus credits or offset credits remitted, including, for each type of credit,

    • (i) the number remitted,

    • (ii) the date of the remittance transaction,

    • (iii) the remittance transaction number,

    • (iv) the serial numbers, and

    • (v) the date or dates on which they were issued; and

  • (g) the details of any units or credits, recognized as compliance units, remitted, including

    • (i) the number remitted,

    • (ii) the province or program authority referred to in subsection 78(1) that issued the units or credits,

    • (iii) the date of their retirement or the date they are designated for use exclusively as a compliance unit for the purposes of remittance to the Minister under section 174, paragraph 178(1)(a) or subsection 181(2) of the Act, as the case may be,

    • (iv) the serial numbers assigned to them by the province or program authority referred to in subsection 78(1),

    • (v) the start date of the offset project for which the unit or credit was issued,

    • (vi) the year in which the GHG reduction or removal occurred for which the unit or credit was issued,

    • (vii) the offset protocol applicable to the project for which the unit or credit was issued, including the version number and publication date, and

    • (viii) the name of the accredited verification body that verified the units or credits.

  • SOR/2023-240, s. 32
.

Marginal note:Surplus credits

  •  (1) For the purposes of section 175 of the Act and subject to subsection (2), the number of surplus credits, equivalent to the difference between the emissions limit and the quantity of GHGs emitted from the covered facility, that the Minister issues is based on what is reported in the annual report submitted for the compliance period if the emissions limit that was set out in the report was calculated in accordance with these Regulations, unless a material discrepancy within the meaning of subsection 49(2) exists with respect to the total quantity of GHGs or the production from one of the specified industrial activities that is used in the calculation of the emissions limit for the compliance period.

  • Marginal note:Exception

    (2) The Minister will not issue surplus credits if the Minister has established the emissions limit or determined the quantity of GHGs emitted from the covered facility for the compliance period under section 53.

  • SOR/2021-197, s. 22
  • SOR/2023-240, s. 33
.

Errors and Omissions

Marginal note:Identification by person responsible

 The notice submitted under subsection 176(1) of the Act by a person responsible for a covered facility who has become aware of an error or omission in an annual report must indicate whether

  • (a) the error or omission would have constituted a material discrepancy under subsection 49(2) if it had been identified during the verification of the annual report; and

  • (b) the aggregate of all errors and omissions would have constituted a material discrepancy under subsection 49(2) if it had been identified during the verification of the annual report.

Marginal note:Corrected report

  •  (1) If the notice indicated that the error or omission, or the aggregate of all errors and omissions, would have constituted a material discrepancy under subsection 49(2), a corrected report, along with a verification report prepared in accordance with section 52, must be submitted to the Minister by the person responsible within 120 days after the day on which the notice is submitted.

  • Marginal note:Content

    (2) The corrected report must include the information referred to in sections 11 and 12 and, under a heading, the following information:

    • (a) the information provided in the annual report that required correction and a description of the corrections made;

    • (b) a description of the circumstances that led to the errors or omissions and an indication of the reasons why the error or omission was not previously detected; and

    • (c) a description of the measures that have been and will be implemented to avoid future errors or omissions of the same type.

  • SOR/2023-240, s. 34
.

Marginal note:Identification by the Minister

  •  (1) Subsection 62(2) applies to a report that is required by the Minister under subsection 177(2) of the Act and the report must be submitted to the Minister within the following period:

    • (a) in the case of a corrected report, 60 days after the day on which the Minister required it; and

    • (b) in the case of a verified corrected report, 120 days after the day on which the Minister required it.

  • Marginal note:Verification report

    (2) The corrected report submitted under paragraph (1)(b) must be submitted with a verification report prepared in accordance with section 52.

  • SOR/2023-240, s. 35
.

Marginal note:Change in obligations

  •  (1) For the purposes of section 178 of the Act, the revised compensation to be paid or remitted or the number of surplus credits to be issued, as the case may be, is equal to the difference between the result of the assessment made in accordance with section 44, and reported in the annual report, and the result that is reported in the corrected report.

  • Marginal note:Revised compensation

    (2) For the purposes of paragraph 178(1)(a) of the Act, any revised compensation is to be provided by means of an excess emissions charge payment or a remittance of compliance units. Revised compensation is to be provided if the difference referred to in subsection (1) is greater than or equal to 500 CO2e tonnes.

  • Marginal note:Issuance of surplus credits

    (3) For the purposes of paragraph 178(1)(b) of the Act and subject to subsection (4), the Minister may issue a number of surplus credits that is equivalent to the difference between, as the case may be,

    • (a) the number of surplus credits that corresponds to the result obtained under section 44 based on the corrected report and the number of surplus credits issued under section 175 of the Act based on the annual report; or

    • (b) the applicable emissions limit and the quantity of GHGs emitted from the covered facility that are reported in the corrected report, if the emissions limit that was set out in the corrected report was calculated in accordance with these Regulations.

  • Marginal note:Exception

    (4) The Minister will not issue surplus credits if

    • (a) a material discrepancy within the meaning of subsection 49(2) exists with respect to the total quantity of GHGs reported in the corrected report or the production from one of the specified industrial activities that is used in the calculation of the emissions limit reported in the corrected report for the compliance period; or

    • (b) the emissions limit or quantity of GHGs emitted from the covered facility is determined by the Minister for the compliance period under section 53.

  • SOR/2023-240, s. 36
.

 [Repealed, SOR/2023-240, s. 36]

Marginal note:Excess Surplus credits issued

  •  (1) If a corrected report shows that an excess number of surplus credits was issued to the person responsible for a covered facility and the credits in question remain in an account in the tracking system that is linked to the covered facility, the Minister must revoke the excess credits without notice. The revocation is effective as of the date on which the corrected report is submitted.

  • Marginal note:Insufficient surplus credits in account

    (2) If any of the excess surplus credits are no longer in an account in the tracking system that is linked to the covered facility, the person responsible for the facility must, within the compensation deadlines set out in subsections 69(1) and (2), make up the amount owed by

    • (a) remitting to the Minister other surplus credits in accordance with section 70;

    • (b) remitting to the Minister other compliance units in accordance with section 71; or

    • (c) making an excess emissions charge payment in accordance with section 55.

Marginal note:Charge

 An excess emissions charge payment made for the purposes of subsection 64(2) must be made in the manner set out in section 55.

  • SOR/2023-240, s. 37
.

Marginal note:Surplus credits

  •  (1) Any revised compensation that is provided by the remittance of surplus credits must be made in the manner set out in section 70.

  • Marginal note:Other compliance units

    (2) Any revised compensation that is provided by the remittance of compliance units other than surplus credits must be made in the manner set out in section 71.

Marginal note:Regular-rate compensation deadline

  •  (1) With respect to revised compensation, the regular rate referred to in subsection 174(3) of the Act applies for a period of 45 days after the day on which the corrected report must be submitted.

  • Marginal note:Increased-rate compensation deadline

    (2) If compensation is not provided in full by the deadline set out in subsection (1), the increased rate referred to in subsection 174(4) of the Act applies for a period of 60 days after that deadline.

  • Marginal note:Other compensation deadlines

    (3) If a corrected report is submitted to the Minister in respect of a compliance period for which the regular-rate compensation deadline set out in subsection 57(1) or (1.1) has not expired, the compensation deadline in respect of that compliance period is the later of

    • (a) the compensation deadlines set out in subsection 57(1), (1.1), (2) or (2.1), as the case may be, and

    • (b) the compensation deadlines under subsection (1) or (2), as the case may be.

  • SOR/2020-114, s. 3
  • SOR/2023-240, s. 38
.

Remittance of Compliance Units

Marginal note:Surplus credits

  •  (1) Subject to subsection (2), any surplus credit may be remitted to the Minister for the purposes of subsection 174(1) or paragraph 178(1)(a) of the Act if the credit was issued no more than five calendar years before the remittance.

  • Marginal note:Details — removal of province

    (2) The surplus credit must have been issued in respect of a facility that is located in a province that was listed in Part 2 of Schedule 1 to the Act for at least one day during the compliance period for which the credit is being remitted.

  • SOR/2021-197, s. 23
.

Marginal note:Other compliance units

 Any recognized unit or credit or offset credit may be remitted to the Minister for the purposes of subsection 174(1) or paragraph 178(1)(a) of the Act if the unit or credit, as the case may be, was issued for GHG reductions or removals that occurred no more than eight calendar years before the remittance.

Suspension and Revocation

Marginal note:Suspension — reasonable grounds

  •  (1) For the purposes of subsection 180(1) of the Act, the Minister may suspend a surplus credit in an account if the Minister has reasonable grounds to believe that the credit

    • (a) was already used;

    • (b) was issued on the basis of false or misleading information; or

    • (c) is no longer valid.

  • Marginal note:Suspension — removal of province

    (1.1) For the purposes of subsection 180(1) of the Act, the Minister may suspend all surplus credits

    • (a) that were issued in respect of a covered facility that is located in a province that was listed in Part 2 of Schedule 1 to the Act but is no longer listed in that Part; and

    • (b) that are in an account in the tracking system that is linked to a facility that is located in a province that is no longer listed in Part 2 of Schedule 1 to the Act and ceased being a covered facility at the time when the name of the province in which it is located was removed from Part 2 of Schedule 1 to the Act.

  • Marginal note:Notice

    (2) The Minister must, without delay, notify the holder of the account of the suspension of the credit, the reasons for the suspension and the date on which it takes effect.

  • Marginal note:Response

    (3) If a credit was suspended on any of the grounds listed in subsection (1), the holder of the account may, within 30 days after the day on which the Minister’s notice under subsection (2) is issued, submit to the Minister their reasons why the credit should not be suspended.

  • Marginal note:Conditional removal of suspension

    (4) The person responsible for a facility who holds an account that is linked to the facility in the tracking system in which there remain surplus credits that were suspended as a result of the name of a province being removed from Part 2 of Schedule 1 to the Act may make a request to the Minister to lift the suspension of those surplus credits if the surplus credits are to be provided as compensation for the facility’s excess emissions under subsection 174(1) of the Act or paragraph 178(1)(a) of the Act, in respect of a compliance period during which the facility was a covered facility.

  • SOR/2021-197, s. 24
.

Marginal note:Revocation

 The Minister must, after the period set out in subsection 72(3), thoroughly review the reasons for the suspension that are set out in subsection 72(1) and notify the holder of the account that

  • (a) if the Minister determines that the reasons for the suspension are well-founded, the surplus credit is revoked; or

  • (b) the suspension of the credit is lifted.

  • SOR/2021-197, s. 25
.

Marginal note:Request for cancellation

 A request under subsection 180(2) of the Act to cancel a surplus credit or offset credit must be made to the Minister in writing and include the serial number of the credit to be cancelled.

Issuance Error or Invalidity

Marginal note:Application of subsection 181(1) of the Act

  •  (1) If the Minister requires a person, under subsection 181(1) of the Act, to remit a compliance unit, the Minister must provide the person a notice indicating the reason for the remittance, the number of compliance units to be remitted and the deadline by which the remittance is to be made.

  • Marginal note:Manner of remittance

    (2) The compliance units remitted to the Minister under subsection 181(2) of the Act must

    • (a) in the case of surplus credits, have been issued within five calendar years before the deadline indicated in the notice provided under subsection (1) and have been issued in respect of a covered facility located in a province that was listed in Part 2 of Schedule 1 to the Act for at least one day during the compliance period for which the credit is being remitted; and

    • (b) in the case of recognized units or credits or offset credits, have been issued for GHG reductions or removals that occurred within the eight calendar years before the deadline indicated in the notice provided under subsection (1).

  • SOR/2021-197, s. 26
.

Tracking System

Marginal note:Accounts for participants

 For the purposes of subsection 186(1) of the Act, any person, other than a person responsible for a covered facility or a proponent within the meaning of subsection 1(1) of the Canadian Greenhouse Gas Offset Credit System Regulations, who wishes to open an account in the tracking system must notify the Minister in writing.

  • SOR/2022-111, s. 47
.

Marginal note:Notice of closure

  •  (1) If an account, other than a GHG Offset Credit System account as defined in the Canadian Greenhouse Gas Offset Credit System Regulations, has been inactive for more than seven years, the Minister may give 60 days’ notice to the holder of the account of the Minister’s intent to close the account.

  • Marginal note:Closing of account

    (2) If the holder of the account fails to request that the account remain open before the expiry of the 60 days, the Minister may close the account under subsection 186(3) of the Act.

  • SOR/2022-111, s. 48
.

Recognized Units or Credits

Marginal note:Compliance unit

  •  (1) A unit or credit is to be recognized as a compliance unit if

    • (a) it is issued by a province or by a program authority on behalf of a province;

    • (b) it is issued under an offset protocol and offset program that is set out on the list published on the Department of the Environment’s website;

    • (c) it is eligible for use as a method of compensation or compliance with respect to a pricing mechanism for GHG emissions in the province in which it was issued; and

    • (d) it corresponds to a GHG reduction or removal of one CO2e tonne.

  • Marginal note:Offset programs

    (2) In establishing the list of offset programs, the Minister must ensure that each one includes the following elements:

    • (a) rules regarding governance, oversight and enforcement;

    • (b) rules regarding registration and renewal of projects;

    • (c) rules regarding the establishment of periods within which units or credits may be issued;

    • (d) rules regarding who is entitled to the credit or unit for the GHG reductions or removals;

    • (e) measures to ensure that GHG reductions and removals are additional and permanent and that reversal risks have been mitigated;

    • (f) measures to ensure that, for a GHG reduction or removal of one CO2e tonne, one credit or unit is issued and the unit or credit is not used more than once;

    • (g) publicly available information on projects, protocols and units or credits; and

    • (h) a requirement that, prior to the issuance of a unit or credit, there be a verification by a third party in accordance with procedures that allow them to determine with a reasonable level of assurance that the associated project meets the requirements of the protocol and program.

  • Marginal note:Offset protocols

    (3) In establishing the list of offset protocols recognized under a program referred to in subsection (2), the Minister must verify that each protocol ensures that

    • (a) the reduction or removal is with respect to a GHG;

    • (b) the reduction or removal is not subject to carbon pollution pricing;

    • (c) the GHG reduction or removal is quantified using scientifically-established methods that allow for

      • (i) the calculation of the quantity of GHG emissions or removals for each GHG source, sink and reservoir,

      • (ii) the quantification of reversals,

      • (ii.1) the assessment of leakage risks,

      • (iii) the calculation of the quantity of GHG reductions or removals that would not have occurred in comparison with the baseline scenario, and

      • (iv) the use of conservative quantification assumptions and approaches;

    • (c.1) the baseline scenario used reflects the most recent data available, any legal requirements and current practices with respect to the activity that is the subject of the protocol;

    • (d) best practices are used for

      • (i) data gathering and management,

      • (ii) record keeping,

      • (iii) the ongoing monitoring of offset projects, including permanence, and

      • (iv) quality assurance and quality control; and

    • (e) the GHG global warming potentials used in calculations are less than or equal to those set out in column 2 of Schedule 3 to the Act.

  • Marginal note:Recognized unit or credit

    (4) A recognized unit or credit must, at the time of its remittance to the Minister,

    • (a) be valid;

    • (b) have been issued in respect of a project that uses a protocol referred to in subsection (3);

    • (c) have been issued in respect of a project located in Canada that began in 2017 or later;

    • (d) have been verified by a verification body that

      • (i) is accredited as a verification body to the ISO Standard 14065 by the Standards Council of Canada, the ANSI National Accreditation Board or any other accreditation organization that is a member of the International Accreditation Forum, and

      • (ii) is not suspended by the accreditation organization that issued its accreditation nor suspended at the time the verification relative to the issuance of the unit or credit occurred or at the time the verification report related to the issuance of the unit or credit was signed; and

    • (e) be designated for use exclusively as a compliance unit for the purposes of remittance to the Minister under section 174, paragraph 178(1)(a) or subsection 181(2) of the Act.

  • SOR/2021-197, s. 27
  • SOR/2023-240, s. 39
.

Transitional Provisions

Marginal note:Subsection 12(3)

 For the 2019 calendar year, despite subsection 12(3), if a covered facility where a specified industrial activity set out in items 2 or 3, column 1, of Schedule 1 is engaged in produces hydrogen gas, the person responsible for the covered facility must include in their annual report the information referred to in that subsection if it is available.

Marginal note:Application

 Section 8 of the Greenhouse Gas Emissions Information Production Order, as it read immediately before August 1, 2019, continues to apply, with any necessary modifications, with respect to a person responsible for a covered facility where an industrial activity set out in Schedule 1 to these Regulations is engaged in until January 1, 2020.

Marginal note:Records

  •  (1) Any records kept in accordance with section 11 of the Greenhouse Gas Emissions Information Production Order, as it read immediately before August 1, 2019, during the period beginning on January 1, 2019 and ending on August 1, 2019, are deemed to be records kept for the purposes of subsection 45(1) of these Regulations.

  • Marginal note:Alternative method

    (2) For the 2019 calendar year, if a person responsible for a covered facility used an alternative sampling, measurement or analysis method for a specified emission type in accordance with section 8 of the Greenhouse Gas Emissions Information Production Order, as it read before August 1, 2019, they must keep a record of a description of that method.

Marginal note:Clinker

 For the 2019 calendar year, despite paragraph 31(1)(a) of these Regulations, the production from a covered facility with respect to the specified industrial activity set out in paragraph 7(a), column 1, of Schedule 1 of these Regulations may be quantified under paragraph 36(c) of the Greenhouse Gas Emissions Information Production Order, as it read immediately before August 1, 2019. If the production is quantified under the Order, it cannot be used in the calculation of the emissions limit under subsection 36(1) of these Regulations.

Marginal note:Glass containers

 For the 2019 calendar year, despite paragraph 31(1)(a) and subsection 36(1) of these Regulations, the production from a covered facility with respect to the specified industrial activity set out in paragraph 9(a), column 1, of Schedule 1 to these Regulations may be quantified in accordance with section 103.2 of the Greenhouse Gas Emissions Information Production Order, as it read before August 1, 2019.

Marginal note:High value chemicals

 For the 2019 calendar year, despite paragraph 31(1)(a) of these Regulations, the production from a facility with respect to the specified industrial activity set out in paragraph 17(a), column 1, of Schedule 1 to these Regulations may be quantified in accordance with section 103.36 of the Greenhouse Gas Emissions Information Production Order, as it read before August 1, 2019.

Marginal note:Isopropyl alcohol

 For the 2019 calendar year, despite subparagraph 11(1)(a)(ii) of these Regulations, the person responsible for the covered facility is not required to quantify the production from the specified industrial activity set out in paragraph 3(c), column 1, of Schedule 1.

Marginal note:Pulp and Paper

  •  (1) For the 2019 calendar year, despite paragraph 31(1)(a) and subsection 36(1) of these Regulations, the production from a covered facility with respect to the specified industrial activity set out in paragraph 36(c), column 1, of Schedule 1 to these Regulations may be quantified in accordance with section 102 of the Greenhouse Gas Emissions Information Production Order, as it read before August 1, 2019. In that case, the output-based standards that apply are

    • (a) 0.203 CO2e tonnes per unit of measurement, in the case of a facility equipped with a recovery boiler, lime kiln or pulping digester, and

    • (b) 0.184 CO2e tonnes per unit of measurement, in the case of a facility not equipped with a recovery boiler, lime kiln or pulping digester.

  • Marginal note:Reporting

    (2) For the 2019 calendar year, if a covered facility where the specified industrial activity set out in paragraph 36(c), column 1, of Schedule 1 to these Regulations is engaged in quantifies production in accordance with subsection (1), the annual report must include the quantity of specialty products produced, in tonnes, if that information is available.

Amendments to the Environmental Administrative Monetary Penalties Regulations

 [Amendments]

 [Amendments]

 [Amendments]

 [Amendments]

 [Amendments]

 [Amendments]

 [Amendments]

Coming into Force

Marginal note:January 1, 2019

  •  (1) Subject to subsections (2) to (6), these Regulations are deemed to have come into force on January 1, 2019.

  • Marginal note:July 1, 2019

    (2) These Regulations apply in Yukon and Nunavut on July 1, 2019.

  • Marginal note:January 1, 2020

    (3) Sections 26 to 30 and subsections 31(2) and (3) come into force on January 1, 2020.

  • Marginal note:August 1, 2019

    (4) Subsection 45(2) of these Regulations comes into force on August 1, 2019.

  • Marginal note:January 1, 2022

    (5) Section 56 comes into force on January 1, 2022.

  • Marginal note:February 16, 2021

    (6) Section 76 comes into force on February 16, 2021.

  • SOR/2021-197, s. 28
.
Loading…