Marginal note:Non-application — end of prescribed life
10 (1) Subject to subsection (2), subsections 9(1), 12(1) and 13(1) do not apply in respect of a unit, other than one that combusts coal, until January 1 of the calendar year following the unit’s end of prescribed life if it
(a) has a commissioning date after December 31, 2009 but before January 1, 2025;
(b) is a planned unit; or
(c) is a boiler unit referred to in subsection 3(4) of the Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity that has an end of prescribed life after December 31, 2034.
Marginal note:Increase in maximum continuous rating
(2) Subsections 9(1), 12(1) and 13(1) begin to apply in respect of a unit referred to in subsection (1) on the later of the following dates if the maximum continuous rating for the unit increases by 15% or more from the maximum continuous rating reported in the registration report submitted for the unit under subsection 7(1), paragraph 7(2)(a) or subsection 8(2):
Marginal note:Date of end of prescribed life
(3) For the purposes of subsection (1) but subject to section 11, a unit’s end of prescribed life is on
(a) December 31 of the calendar year that is 25 years after the unit’s commissioning date, in the case of a unit referred to in paragraph (1)(a);
(b) December 31, 2049, in the case of a planned unit; and
(c) December 31 of the calendar year before the prohibition set out in subsection 4(2) of the Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity would have applied to the unit, as determined under that subsection, in the case of a unit referred to in paragraph (1)(c).
Version in force since January 1, 2025