In forceCurrent to September 30, 2026 HistoryRegistered on December 13, 2024Made under: Canadian Environmental Protection Act, 1999

Follow

Obligations

Section 13

Marginal note:Net supply

  • The following provision is not in force.

     (1) The responsible person for a unit must, for each calendar year, determine the net supply from the facility where the unit is located.

  • Marginal note:Determination

    (2) The net supply from a facility is determined by the formula

    Qt − Qr − Qa − Qna − Qec

    where

    Qt
    is the quantity of electricity transmitted from the facility to an electricity system during the calendar year;
    Qr
    is the quantity of electricity transmitted to the facility from an electricity system during the calendar year;
    Qa
    is the quantity of electricity allocated to the facility for the calendar year in accordance with subsection (4);
    Qna
    is the sum of the quantities of electricity generated at the facility during the calendar year by
    • (a) any unit that has not reached the end of its prescribed life as determined in accordance with subsection 10(3) or section 11,

    • (b) any unit to which these Regulations do not apply, other than a unit that has been registered as multiple subunits in accordance with section 8, and

    • (c) any source of electricity generation at the facility that is not a unit; and

    Qec
    is the sum of the quantities of electricity generated by any unit located at the facility, other than a unit referred to in the description of Qna, during any deduction period during the calendar year.
  • Marginal note:Measurement

    (3) The quantities of electricity referred to in subsection (2) must be expressed in GWh and must be measured

    • (a) in the case of the quantities referred to in the descriptions of Qt, Qr and Qa, using meters that measure the transfer of electricity; and

    • (b) in the case of the quantities referred to in the descriptions of Qna and Qec, at the electrical terminals of the generators of the unit or, in the case of a source of electricity generation that is not a unit, at the electrical terminals of the source.

  • Marginal note:Electricity allocated to facility (Qa)

    (4) A quantity must not be assigned to Qa in subsection (2) unless, during the calendar year for which the quantity is assigned, the facility transmits electricity to an electricity system and supplies useful thermal energy to a recipient facility and the following conditions are met:

    • (a) the recipient facility is not a facility where a unit to which these Regulations apply is located;

    • (b) the quantity assigned to Qa does not exceed the quantity of electricity transmitted to the recipient facility from the electricity system during that calendar year; and

    • (c) the responsible person obtains from the recipient facility documentation that

      • (i) indicates the quantity of electricity transmitted to the recipient facility from the electricity system during the calendar year, and

      • (ii) demonstrates that the quantity of electricity was measured using an electricity meter that is installed, maintained and calibrated in accordance with subsections 36(1) and (2) and that enables measurements to be made in accordance with subsection 36(3).

  • Marginal note:Overlapping deduction periods

    (5) A quantity of electricity generated by a unit must not be included in more than one deduction period for the purposes of determining the quantity for Qec in subsection (2).